This paper addresses two types of situations to contend with in building assessment: aging structures all built at about the same time and to standards no longer acceptable, and newer...

Prestress and Cracking Problems in Concrete Structural Components of an Elevated Rail Transit Guideway System
In 1983 the Department of Transportation evaluated the quality of construction of selected structural components on the Dade County Transportation Administration METRORAIL elevated guideways....

Composite and Mixed Construction
Steel and reinforced concrete are frequently combined in composite or mixed structural systems. This combination generally results isn greater economy and safety than could be achieved...

Specifications for the Design and Construction of Composite Slabs and Commentary on Specifications for the Design and Construction of Composite Slabs
Composite slab construction is defined as a system comprising normal weight or lightweight structural concrete placed permanently over cold-formed steel decking in which the steel deck...

Performance of Cogoti Dam Under Seismic Loading
At the time of its completion in 1938, the 280 ft (85 m) high Cogoti concrete face rockfill dam was exceeded in height by only one other dam of its type in the world, Salt Springs Dam....

New Exchequer Dam, California
New Exchequer Dam design, in 1963, was in the transition period in which dumped rockfill was being recognized as having undesirable settlement characteristics, and compaction of rockfill...

Design, Construction & Performance of Fades Dam
The project, construction and performance of les Fades dam are described. Les Fades dam is one of the first concrete faced rockfill dams compacted with a vibratory roller. A vibratory...

Weak Rock in Two Rockfill Dams
Two South Australian concrete face compacted rockfill dams, built from soft rock won from each dam site, have performed successfully in service with only small leakage and settlements...

Alto Anchicaya Dam?Ten Years Performance
The general aspects of design and construction of the Alto Anchicaya Dam duilt during 1970 - 1974 in Colombia, South America are described. The paper refers to the performance of the structure...

Membrane Sealing of Rouchain Dam
A synthetic sealing membrane was used to prevent excessive leakage through the facing of an embankment dam. The works, which were completed rapidly and at low cost, enabled the reservoir...

Golillas Dam?Design, Construction and Performance
Golillas Dam is a concrete face, gravel fill dam, 125 m (410 ft) high built seven years ago that has had some difficulties during its initial operating years; due to the shape of the canyon,...

The Outardes 2 Concrete-Faced Rockfill Dam
The main dam of the Outardes 2 development consists of a rockfill embankment, built against an old water-retaining structure, and faced with an upstream concrete membrane. The interface...

Concrete Face Rockfill Dams of the Winneke Project
Two of the three dams forming the Winneke Reservoir, near Melbourne, Australia, are concrete face rockfill dams. A minor dam forming the sludge storage pond for the project's...

The R. D. Bailey Dam, a Concrete-Faced, Earth-Rockfill
A case history for the R. D. Bailey Dam, describing its comparatively unique design and construction considerations, and its operational performance since initial reservoir filling in...

Foz do Areia Dam?Design, Construction, and Behaviour
The 525 ft (160 m) high Foz do Areia dam in the Iguacu River, Parana, Brazil, built by 'Companhia Paranaense de Energia - COPEL', between 1975-1980, is part of...

Construction of Foz do Areia Dam
The methods and equipment for the construction of Foz do Areia Dam during 1976-1980 in Brazil are described. Special emphasis is given to the rockfill construction. Foz do Areia was the...

Mangrove Creek Dam: Use of Soft Rock for Rockfill
Mangrove Creek Dam is an 80 m high concrete faced rockfill dam (CFRD) completed in 1981. The embankment was constructed largely out of low strength sandstones and siltstones available...

Design and Performance of Shiroro Rockfill Dam
Shiroro Dam, constructed across the Kaduna River in Nigeria, is a rockfill dam with reinforced concrete facing. The dam was completed in late 1983, and reservoir impounding started in...

Fortuna Concrete Face Rockfill Dam
The Fortuna Dam is a 60 m high concrete face rockfill dam located in Panama, designed to be built in two stages. This paper describes the construction of the first stage dam, 60 m high,...

Design Features of Salvajina Dam
Salvajina dam is the second highest concrete face rockfill dam currently in service in the world. The characteristics of the foundation of the toe slab vary from fresh, sound and little...

 

 

 

 