Geographical Information Systems and Remote Sensing: a possible support in 2D modelling of flood propagation
This paper examines some specific aspects regarding the implementation of a 2D mathematical model of flood propagation, namely that of input and output data management. The problems connected...

A Computerized Open Channel Flow Measurement Device
This is a technical information paper with the intention of introducing a new product. It is not the intent of the author to use this as a marketing tool. However, it is the intent to...

Demonstration Project for Scour Instrumentation
A Federal Highway Administration (FHWA) Demonstration Project was developed to facilitate technology transfer of instrumentation related research to the highway industry. The objective...

Velocity Measurements by the One-Orange Method
Application of the most sophisticated instrumentation - so called state-of-the-art equipment - is not always necessary nor even desirable for measurement of mean velocities in verticals,...

Bridge Scour Instrumentation
This paper presents a brief status report of research funded by the National Cooperative Highway Research Program (NCHRP Project 21-3, Instrumentation for Measuring Scour at Bridge Piers...

Reservoir Operation by the Use of an Expert System
Most reservoirs, designed for the purpose of flood control, face operational problems during periods of drought. This study uses five indicators, streamflow, precipitation, temperature,...

Farakka Barrage - It's Impacts and Possible Mitigation
The paper discusses the impacts and possible implications of the Farraka Barrage Project across the Ganges River on different sectors in Bangladesh including hydrology and river morphology,...

Integrated Planning for International River Basin
The integrated development of the Vardar/Axios Basin includes a system of projects scheduled to meet the needs and aspirations of Yugoslavia (in particular, the former Socialist Republic...

Benefits of Hazard Mitigation Planning to Reduce Shoreline Impacts Due to Great Lakes Water Level Management Fluctuations and Severe Storms
Recent experience with flood hazard mitigation planning that encompassed aspects of pre-disaster preparedness and recovery operations have proven to be an effective tool in geographic...

The Regulation of Lake Ontario During the Spring of 1993; a Period of Record Supplies
A wet summer in 1992 and record water supplies to Lake Ontario during early 1993 resulted in very high levels on the lake. Actions by the International St. Lawrence River Board of Control...

A Nearshore Model for Cleveland CSO Remediation Design Selection
Three models were combined to analyze the fate of Combined Sewer Overflows (CSOs) in the Cleveland, Ohio area. Firstly, a 20 year hindcast of Lake Erie was used to find design storms by...

Third Lake Watershed Assessment and Action Plan
Third Lake, located in Lake County, Illinois, is expected to exhibit worsening inlake water quality as development occurs within its watershed. A geographic information system (GIS) application...

Groundwater Remediation at a Superfund Site
Soil and groundwater contamination at the Montana Post & Pole site in Butte, Montana, one of the nation's oldest Superfund sites, has developed into one of the most significant...

Fate/Transport Modeling and Remediation of Contaminated Plume at Vance Airforce Base
Air Training Command (ATC) at Vance Air Force Base (VAFB) is responsible for implementing the Installation Restoration Program (IRP) according to the Comprehensive Environmental Response,...

Genetic Algorithms in Groundwater Management
The aim of this paper is to examine applicability of genetic algorithms in groundwater planning and management. A brief description of genetic algorithms and the associated advantages...

Groundwater Development and Related Issues
Optimum development and management of ground water resources requires consideration of all elements of the groundwater system and their inter-relations with total hydrologic cycle along...

Development of Transport Model for Groundwater Planning and Management in Taipei Basin
The objective of this paper is to develop a groundwater model for contaminant transport simulation. The transport model, in conjunction with the previously developed flow model, is used...

Flood Monitoring Network In Southeastern Louisiana
A flood monitoring network has been established to alert emergency operations personnel and the public about hydrologic conditions in the Amite River Basin. The U.S. Geological Survey...

Instream and Streambank Environmental Feature Guidelines
Tightened regulatory requirements and a renewed appreciation for the benefits of preserving our diminishing natural resources have led to a recent profusion of stream restoration projects...

A Fish Bypass Screen at Puntledge Project
An Eicher screen has been designed for the Puntledge Diversion Project on Vancouver Island in British Columbia, Canada. Its purpose is to reduce the mortality of downstream migrating juvenile...

 

 

 

 

Return to search