Synopsis of Harry S. Truman Turbine Repair
The Harry S. Truman Powerplant was designed and constructed under the supervision of the U. S. Army Corps of Engineers and is located on the Osage River near Warsaw, Missouri. During 1981...

An Analysis of Cavitation Damage in a Francis Turbine Operating Under Small Opening Condition
In this paper some new formulae are derived to estimate the pressure and the relative velocities in the crown and the band regions of the Francis turbine runner operating under any gate...

Field Observations of Cavitation Erosion in Hydraulic Turbines
Field surveys of the operational and design characteristics of 602 hydroturbines installed since 1950 and having a capacity in excess of 20 MW or a discharge diameter greater than 3 meters...

Racine?5 Years of Successful Operating Experience with the World's Largest Bulb Turbines
In September 1982 two bulb turbine generating sets with a runner diameter of 7700 mm and a generator rating of 25 MVA were put into commercial operation at the Racine dam on the Ohio river....

Development of Three Systems Operated Rev. Pump Turbine
In order to represent the development of reversible, single stage pump turbines in Yugoslavia, the three systems operated pump turbine (3SRPT) of the fourth unit of Moste hydro power plant,...

Computer Aided Design of Butterfly Inlet Valves
Computer simulation of butterfly inlet valves (throughflow, lattice) in hydropower schemes is presented. The software is intended for practisting engineers to obtain significant parameters...

Synchronous Bypass Valves for Hydroplants
The requirement that synchronous bypass valves be provided on most hydroplants and the high cost of suitable valves have created a demand for rebuilt valves. Recently, the Bureau of Reclamation...

Fire Protection at the Grand Coulee Hydro Project
In the fall of 1980 a rupture of one of the Project's 525kV transmission cables occurred and created a fire. Power from three Third Powerplant 700MW units was interrupted,...

Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines, each rated at 123,000 HP (91,720 kW) at a net head of 64. 9 ft. (19. 8m). The plant has...

Turbine Efficiency Monitoring Utilizing Ultrasonic Flowrate Measurement
On-line turbine efficiency measurement can be achieved by ultrasonic flowrate measurement and state-of-the-art data acquisition techniques. A field performance test program conducted at...

Field Testing: Producing Complete Test Results on Site, A Realistic Objective
Modern technologies and instruments have had an influence in nearly every field imaginable. At Hydro-Quebec, the last ten years have brought about a complete transformation in the way...

Index Testing With a Data Acquisition and Control System
A computer controlled index test has been developed that can be used to optimize blade-gate relationships on adjustable blade (Kaplan) hydraulic turbines. This paper includes hardware...

Basic Considerations in Governed or Non-Governed Small Hydro Power Plants
This paper reviews the necessary studies and major considerations that must be completed for proper coordination and selection of a turbine governor, and generator. A discussion of the...

Design and Commissioning of the Philadelphia Hydroelectric Project
The Philadelphia Hydroelectric Project consists of a single horizontal-shaft double-regulated S-type unit, rated 3440 kW, utilizing a programmable controller for unit operation together...

Digital Control of 180MW Francis Turbines: Controller Design, Simulation, and Operational Results
The features of a new hydro-power station are outlined as are some specifications that the customer required of a digital controller. Both hardware and software aspects of this recently...

Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...

An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...

Efficiency in Auxiliary Electrical Systems
In 1984, during the preliminary design for the proposed second powerhouse at the Corps of Engineers' McNary Dam on the Columbia River, the more recent improvements and techniques...

Grand Coulee SCADA System Procurement
Purchasing a quality Supervisory Control and Data Acquisition (SCADA) or Energy Control System (ECS) at a reasonable price for a particular installation can be a challenging undertaking....

Generator/Motors and Adjustable-Speed Drives for Waddell Pumped-Storage Plant
This paper describes the pumping and generating units and associated electrical equipment planned for Waddell Pumped-Storage Plant. Waddell Pumped-Storage Plant is to be located near Phoenix,...

 

 

 

 