Concrete Overlays Challenge Asphalt
When a pavement needs more than minor repair but not total replacement, bonded and unbonded concrete overlays and inlays are options to consider. The article describes four projects where...
Armor Protection for Rubble Mound Breakwaters
A brief summary of past practices in breakwater armor system design is presented. The limitations of current design procedures for rubble mound breakwaters are discussed and improved methods...
Plastic Concrete Cutoff Walls
The studies revealed that plastic concrete can be prepared having a coefficient of hydraulic conductivity that is less than 1 multiplied by 10** minus **7 cm/sec. The shear strength of...
Computer Aided Simulation of Fluid-Structure Interaction Problems
The papers included in this book represent state-of-the-art developments in and applications of computer aided simulation of fluid-structure interaction problems in both the terrestrial...
Guide for the Design and Use of Concrete Poles
Prepared by the Concrete Pole Task Committee of the Committee on Electrical Transmission Structures of the Structural Division of ASCE. This guide presents...
Spanning the Seas
A proposed structural scheme, called the V�tower system, could cross vast stretches of water with record length spans yet use only conventional materials. An example is a bridge proposed...
Water Jets: Concrete Yes, Tunneling Maybe
High pressure water jets are demolishing concrete from bridge and parking decks, faster and at lower cost than by traditional means. The technique is fast becoming an acceptable option....
Case Studies?Semi-Closed Pipeline Systems
The paper discusses the title subject in terms of automated systems, flexible scheduling, and system components. Project locations include the Mahaweli Development Project, Sri Lanka;...
Case Study?Open Pipeline System, Coachella Valley Water District
A supervisory canal control system installation was started in 1966, seventeen years after start up, and a major upgrading was completed in 1983. The canal delivery system now has a central...
Stepped Spillway Design with a RCC Dam
The hydraulic model study results for the Upper Stillwater stepped spillway design are presented. The studies encompassed several spillway geometries and design unit discharges ranging...
Parametric Analysis of Concrete Gravity Dams using Finite Element Analysis
More sophisticated means of analyses have been investigated to determine the accuracy and applicability of conventional methods to a range of parameters affecting stability. This paper...
Rehabilitation Measures?Wanaque Reservoir System
The rehabilitation of Pompton Lake Dam and the dams of the Wanaque Reservoir System has provided the North Jersey District Water Supply Commission with a safe, dependable source of water...
Rehabilitation of Williams Bridge Dam
Pennsylvania Gas and Water Company initiated construction work to upgrade the 90-year old dam in order to meet current dam safety standards with emphasis on satisfying Probable Maximum...
Hydraulic Design of Pamo Dam Spillway
The design of the emergency spillway for the San Diego County Water Authority's (SDCWA) proposed Pamo Dam is discussed. Pamo Dam is a 264-foot (80. 5 meter) high roller compacted...
Design of Overtopping Protection for Small Dams
Many existing small embankment dams in the United States cannot safely pass current design floods without overtopping. In the past several years, embankment overtopping protection has...
Spring Creek Dam is Ready for the PMF: A Case History
Spring Creek Dam is the first earth embankment dam in Colorado, with inadequate spillway capacity, to be modified utilizing roller compacted concrete (RCC). With a structural height of...
Rehabilitation of the SF Calawah River Bridge
The failure of a 4-span reinforced concrete bridge in Washington State initiated a study that ultimately led to a unique method of bridge rehabilitation. Severe scour resulted in settlement...
The Design of Stays for Cable Stayed Bridges
Much of the R & D work done in the development of details for the modernized form of stayed girder bridges has been contributed by those practicing in the field of prestressed...
Development of a Double Tee Structural System for Highway Bridges
The fully precast, prestressed double tee beams are tied together by transverse post-tensioning through simple grout filled V-joints. The system provides for complete transversal continuity...
Innovative Approaches to Bridge Pier Foundation Design
As a part of a Value Engineering change proposal the pier foundations for the US-31 bridge over the St. Joseph River and floodplain near Niles, Michigan were re-designed. The varying soil...
Return to search