Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...

Predicted and Observed Axial Behavior of Piles
Results of a Pile Prediction Symposium
This publication presents the results of a pile capacity event that was held at the Lakefill site on the Evanston Campus of Northwestern University in conjunction with the 1989 Foundation...

Storing Sediment and Freeing Fish
When Mount St. Helens erupted in May 1980, it sent a river of pyroclastic ash and other debris into Washington's North Fork Toutle River Valley. The resulting debris pile...

Asphalt-Rubber Concrete?A New Horizon
The performance of asphalt concrete pavements is dependent to a large degree upon the rheological properties of the asphalt binder. Asphalt-rubber as a binder material extends the temperature...

SPIDA Method for Reinforced Concrete Pipe Design
The required supporting strength of buried pipe is affected by the total load that is imposed upon the pipe and the manner in which the pipe is supported by the surrounding soil. The installation...

Hot Mix Asphalt Utilization in Railway Trackbeds
Described herein are the rationales for, descriptions of and evaluations of hot-mix asphalt (HMA) trackbed rehabilitation and construction techniques recently utilized in various classes...

Liability Traps to Avoid
This presentation shows several problem situations and the rules of the game as played by the industry and the courts. It makes three basic assumptions. One, the Materials Engineer knows...

Parking Garage Crisis
Corrosion in reinforced concrete parking garages is reaching crisis proportions. The rehabilitation market for these structures is estimated to be as much as $750 million a year, or 30%...

Segmental Tunnel Lining Meets `Buy American'
Segmental concrete tunnel lining is the other innovation proven during construction of the Washington Metropolitan Area Transit Authority (`wmata'). Although `wmata's'...

Box Segmentals: Refining Design
Officials at the Florida Department of Transportation (FDOT), which has built more precast concrete segmental box girder bridges than any other state, say their troubles with that design...

Post-Tensioned Transportation
Post-tensioned highways are relatively new. U.S. 220 near Altoona, Pa. has the first major installation in the country. There two miles of pavement are continuous concrete panels, each...

High-Strength Concrete: Weighing the Benefits
Russell, Gebler and Whiting describe the properties of high-strength concretes, the current state of knowledge on freeze/thaw effects, and procedures for batching, mixing, transporting,...

Rx for Dam Repair
Bernard asserts the growing importance of maintenance to extend the service life of dams as more and more of them reach or exceed their design lives. He describes renovations to Easton...

Creative Application of Materials Engineering
Society's demand for an aesthetically pleasing and safe constructed environment, along with the construction industry's higher and higher costs, dictate that...

Specification as a Requirement for Hot Mix Asphalt
A brief description of the current national research programs that affect the development of specifications is included in this paper. Elements of the Strategic Highway Research Program...

Transferring Construction Innovation into Practice: Lessons Learned
The paper presents several cases that illustrate the value of a systems approach in the need for aggressive and persistent exploitation despite early set-backs, and the unsatisfactory...

Developing Performance Concrete and Its Acceptance by Code Authorities
Projects incorporating the benefits of Performance Oriented Concrete frequently occur within the established jurisdictions of specific building departments, highway departments, or other...

Stabilizing a `Mann'-Sized Sinkhole
On Sept. 21, 1988, a sinkhole suddenly developed beneath a transmission/distribution effluent pipeline on Mann Road in Orange County, FL. Initially it measured 30 ft in diameter and 8...

Bells Under Bells
Chicago's newest office tower is supported on new bells that had to be constructed below existing belled caissons. Existing caisson foundations from a previous structure on...

Specifications for Masonry Structures
Specifications for Masonry Structure (AC1530.1-88/ASCE6-88) is a joint effort of the American Concrete Institute and the American Society of...

 

 

 

 

Return to search