Weathering of Constituents at Land Treatment Sites
The objectives of this research were to: 1) determine the leachability of metals and organics from soils at hazardous waste land treatment sites; 2) evaluate the mobility of hazardous...

An Evaluation of Hazardous Waste Land Treatment Closure Options
The purpose of this research was to evaluate changes in the persistence and mobility of the residues remaining when hazardous waste land treatment (HWLT) sites are closed. This evaluation...

The Utilization of a Deflocculant to Decrease the Permeability of a Clay Liner
A hazardous waste landfill was completed in Oklahoma during 1988. The clay liner was constructed to fulfill the RCRA requirements for permeability of equal to or less than 1E-07 centimeters...

Design and Implementation of a Risk-Based Remedial Action Program for Underground Tank Removal at a Dioxin-Contaminated Site
The unknown or uncertain conditions often inherent in hazardous waste site remediation projects complicate the job of the responsible professional to adequately assess and manage associated...

The MSU Sprinkling Infiltrometer: A Device to Measure Time-to-Ponding
Time-to-ponding can be determined quickly and with minimal disturbance to the soil surface by the use of a sprinking infiltrometer developed at Michigan State University (MSU). Solenoid...

Attitudes and Health Effects of Water Reuse
This paper is concerned with public attitudes toward water reuse for irrigation and with the consequences of human contact with reclaimed wastewater. Initially, attitudes are considered...

Model Study of Side Slope Riprap
Laboratory experiments were conducted in 10-m long channels having 1.5 H : 1 V side slopes protected with a 20.7-mm diameter rock layer 1.5 diameters thick. Four models were tested. In...

Empirical Methods in the Design of Ground-Water Quality Monitoring Strategies
Ground-water quality monitoring strategies are designed for environments ranging from the complex to the very simple. Complexity is characterized by socio-economic, public health, and...

Application of Hydrodynamic and Water Quality Models at a Superfund Site in Montana
The water quality model applied to the site is the EPA-supported hydrodynamic and water quality model WASP4 with a modification to enable it to better simulate riverine systems. To provide...

Risk-Cost Principles for Dam Safety Analysis
The purpose of this paper is to present the principles and issues of risk-cost analysis as they have evolved in the evaluation of dam safety improvements. The paper also reviews some results...

Extreme Flood Probability Estimates in Practice
Selecting the safety design flood for a dam or siting structures where flooding would cause severe social or economic disruption requires balancing the likelihood and consequences of failure...

Impact of Risk-Based Analysis on Hydrologic Design Practices
This paper provides a brief review of the current hydrologic design practices of the U.S. Army Corps of Engineers (USACOE) for safety inspection of dams and the current hydrologic design...

Vessel Induced Physical Effects in a Navigation Channel
The U.S. Army Corps of Engineers is investigating ways to improve lockage efficiency at the Marmet Locks on the Kanawha River, West Virginia. A physical effects prediction model have been...

Trashrack Cleaning?A Job Requiring Utmost Care
During the last few years, the tendency in most industries has been towards more automation. Hydro has been no exception. Trashrack raking machines have followed this trend, and automatic...

Uplift Pressures in Existing Concrete Dams
This paper is a brief summary of a report of the same title prepared for the Electric Power Research Institute (EPRI) as part of its program to study ways to economically improve dam safety....

Safety Evaluation of PG&E Dams
Pacific Gas and Electric Co. (PG&E) owns and operates 71 hydroelectric power projects in Northern and Central California. With 115 dams in its system, PG&E is the largest...

Ghost Dam Safety Evaluation
Ghost Development, owned and operated by TransAlta Utilities, is near the eastern margin of the Rocky Mountain Foothills, approximately 33 km northwest of Calgary, Alberta. The development...

Case Study Safety Evaluation of the Existing Wise Powerhouse Penstock
A 70-year old riveted penstock was analyzed to determine its actual design strength in response to the discovery of significant pressure rises under normal operating conditions due to...

Public Safety through Cooperation
This paper describes the present FERC dam safety compliance program. The program's philosophy and history, organization, and key elements as well as accomplishments are presented...

The Direction of FERC's Envorcement Program
This article discusses recent developments in enforcement by the Federal Energy Regulatory Commission ('Commission' or 'FERC') of its...

 

 

 

 

Return to search