A Watershed Model of Sediment Transport?Load-I
A watershed sediment transport model has been formulated and optimized upon storm hydrographs and the associated sediment load data for several watersheds that have been urbanized and...
A Stochastic Approach to Sediment Transport in Alluvial Rivers
A dimensionless sediment transport function relation for alluvial rivers has been developed using stochastic approach. The dimensionless function may be applied to estimate suspended load,...
Effects of Climate Change on Watershed Runoff
This paper examines forecasts of changes in watershed runoff in the Delaware River basin that result from a range of predicted effects of increased atmospheric carbon dioxide (CO2)...
Seven Oaks Dam Outlet Works Design
The U.S. Army Corps of Engineers has completed the preliminary design of the outlet works for the proposed Seven Oaks Dam. The dam is the upstream-most feature of the Corps'...
Fixed-Wheel Gates Uses and Limitations
The fixed-wheel type of gate, which derives its name from sets of wheels mounted on axles fixed to the gate, rolls upon and transmits the hydraulic load of the gate to guide tracks bearing...
Determining Hydro Project Dependable Capacity
Traditional techniques for estimating a hydro project's dependable capacity are of limited value when evaluating a hydro project in a thermal-based power system. For such...
Quantifying Uncertainty in Hydropower Planning
Power system operators must deal with various types of uncertainties. Some are related to inputs, such as system load and water supply, while others pertain to the system itself, such...
Efficiency and Vibration Testing
To gather the necessary data to assure the most efficient and reliable operation of the system, Idaho Power Company implemented a plant testing program in 1988. The testing program consists...
Thermally Developed Blade Stresses and Cavitation Damage
Cavitation damage to the turbine runner blades, to the draft tube liner, and to the runner hub requires extensive welding repair. The traditional repair method is to gouge out the damaged...
Design and Installation of Prestressed Rock Anchors for Penstocks at the Sheldon Springs Project
A mini-hydroelectric project producing 25MW of power was recently completed near St. Albans, Vermont. The power conduit conveys water from the intake on the river to a bifurcation and...
Optimization of Power Production Based on Efficiency Data
Computer programs dealing with different parts of the optimization process are in operation in Norway today, and they include: the hydrological part from weather forecast to reservoir...
Optimizing Joint Load Control for Hydroelectric Plants
This paper discusses a method to minimize water usage at a multi-turbine hydroelectric generating plant. At plants which do not spill water this optimization is directly converted to extra...
Acoustic Flowmeter/Efficiency System Installation at the Niagara Power Project
The New York Power Authority's Robert Moses Niagara Power Project (RMNPP) recently installed an acoustic flowmeter/efficiency system on two 150 MW rated generators. This paper...
Analysis of Unsteady Flows in Irrigation Canals Due to Load Rejection in Hydroelectric Project
An add-on hydroelectric project has been proposed for the Owyhee Tunnel No. 1, a component of the Owyhee Irrigation Project constructed in the 1930's by the U.S. Bureau of...
Foundation Engineering
Current Principles and Practices
The proceedings of the 1989 ASCE Foundation Engineering Congress (entitled Foundation Engineering: Current Principles and Practices) address advances in the state-of-practice and in research...
Predicted and Observed Axial Behavior of Piles
Results of a Pile Prediction Symposium
This publication presents the results of a pile capacity event that was held at the Lakefill site on the Evanston Campus of Northwestern University in conjunction with the 1989 Foundation...
Glitches in Flitch Beam Design
Wiesenfeld proposes a set of design criteria for flitch beams. These beams, in which wood and steel sections are bolted together to act as a single structural unit, are currently covered...
New Roof for an Aging Temporary
The wartime temporary design of a 1942 industrial building justified use of green timber for its roof trusses and higher than usual allowable design stresses. Some 45 years later, a new...
Resilient Moduli of Soils
Laboratory Conditions
Historically, structural pavement design has been based on static testing techniques, such as the CBR. More recently, the profession has placed increased emphasis on repeated load testing...
Eliminating Bias in Construction Schedules to Measure Time
Schedules developed for use in managing the construction process which are accurate for that use are not necessarily sufficiently accurate to measure and evaluate delays and changes to...
Return to search