Instream Habitat Considering Hydro-Peaking
Hydroelectric projects with storage have the characteristic of being able to generate electricity with short notice and to stop generating electricity with equally short notice. This peaking...

A Comparison of Two Reservoir Projects and Associated Fisheries Impacts
The evaluation of environmental impacts is a critical component of reservoir project development. Impacts to fisheries are especially significant because of the extensive alteration to...

Hueco Bolson Recharge Demonstration Project
The Hueco Bolson Recharge Project in El Paso, Texas, is a unique recharge system, being a full-scale program in operation for 5 years in which municipal sewage is treated to potable quality...

Electronic Communication and Data Transfer: Productivity Enhancements
Large ventures operating from widely separated sites cannot depend on local area networks for their communication requirements, as can small, single-sited projects. Not all projects have...

MacIntosh II True-Color Visual Simulation Project: A Proposed Elevated Rail System for Metropolitan Phoenix
Utilizing new high-resolution, 24-bit true-color technology available for the Macintosh II microcomputer, this project enabled professional consultants and the public to visualize a proposed...

Applying TRANPLAN to Assist Air Quality Impact Analysis
Environmental analysts have been using the plotting capabilities of TRANPLAN, a transportation planning software package, to facilitate the analysis of air quality impacts of the Boston...

A Microcomputer Package for Interrelating the Highway Capacity Manual and SOAP 84
There is some evidence that the SOAP program may replicate signalized intersection delay more realistically than the 1985 Highway Capacity Manual (HCM) operational procedure for signalized...

Microcomputer Applications in the Development of a Traffic Operations Control Center
There is a growing need for new methods to maximize highway transportation operations, and a growing set of tools for the engineer to use in this task. This report examines one specific...

Guidelines for Micro-CADD Implementation - How You Can Do it Right the First Time
This paper discusses methods found to be useful in applying selected lower cost microcomputer-CADD systems in the civil engineering environment CAD is defined as Computer Aided Drafting...

California DOT CADD
Starting in 1983 the California Department of Transportation (Caltrans) embarked on a project to incorporate current computer technology into the project development process. Today the...

Collection and Analysis of Speed and Delay Using Portable Microcomputers
Speed and delay studies are performed routinely on urban street networks. The data are used for a variety of transportation engineering purposes including signal timing design, roadway...

Knowledge Based Expert Systems for Post-Incident Freeway Traffic Control
A knowledge based expert system for rerouting traffic upstream of an accident or other capacity-reducing incident on a freeway network is developed and compared with results obtained using...

A Bridge Management System Module for the Selection of Rehabilitation and Replacement Projects
A procedure, developed for the state of Texas is reported, which determines an allocation budget for bridge replacement and rehabilitation projects, using multi-attribute criteria and...

Validation of a Traffic Modeling System for Detour Planning
The Downtown Seattle Transit Project (DSTP) was initiated as an effort to relieve existing traffic congestion in downtown Seattle. It consists primarily of a 1.3-mile electric-bus tunnel...

Using Microcomputers for Project Management
Microcomputers for both project scheduling and cost control were used during design and construction on a major project in Honolulu. Hotel Street Mall, located in the heart of Honolulu's...

A User-Friendly Capital Programming Tool for Highway Maintenance Districts
The Roads and Waterways Administration of Finland is developing a microcomputer system, called the Project Analysis System (PAS), to help district engineers in their annual preparation...

High-Country Hydro
The North Fork Stanislaus River Hydroelectric Development Project is a new 205 MW $267 million hydro plant in the Sierra Nevada Mountains. Completed in 1989, the project was the largest...

Implementing the E-470 Beltway
The paper addresses various elements of implementing the 50 mile eastern half of the beltway around the Denver metro area. This paper addresses many unique characteristics associated with...

Public-Private Relationship in Transportation Development
The paper explores the mechanism and development of public-private partnership which has resulted in the participatory growth of transportation projects in the Portland Metropolitan area....

South Boston Piers Transit Project
The Massachusetts Bay Transportation Authority (MBTA) is proposing to construct a new transit connection between downtown Boston and the South Boston Piers area. The MBTA has worked with...

 

 

 

 

Return to search