Hydroelectric Project Design Using Microcomputers
The main issue in the first stage of a hydroelectric project is to assess the influence of hydrologic parameters on design and optimum sizing of the installation and on future energy production....
Riverbank Stability and Monitoring at Grand Coulee Dam
The capability for hydroelectric power generation at Grand Coulee Dam was substantially increased following construction of the third powerplant in the mid 1970s. Increased river fluctuations...
New Runners for Aswan High Dam Power Station
Replacing turbine runners at Egypt's Aswan High Dam Power Station is a major project because of the size, quantity and importance of these turbines to the Egyptian economy....
Strain Gaging and Data Acquisition at the TLMRF
Strain gages are the major source of data for the TLMRF (Transmission Line Mechanical Research Facility) research program. Measurement of member loads and bending moments in lattice towers...
Costs of Truck Related Highway Damage to Alaska
The cost of pavement damage to the State of Alaska for truck traffic continues to be a very controversial topic. There is no simple answer since this cost is dependent upon pavement strength,...
Ester West Slide?A Case History
An 80 foot high embankment was benched into graphitic schist permafrost on a north facing slope approximately 25 miles west of Fairbanks, Alaska. Soon after construction approximately...
Geotechnical investigation: Cominco's Red Dog Mine Facilities
The siting of major facilities associated with development of the Red Dog Mine Complex in Northwestern Alaska on relatively warm permafrost soil and rock presented geotechnical engineers...
Finite Element Analysis of Concrete Armor Units Subject to Wave Impact
Concrete armor units are commonly employed for the protection of shorelines and rubble structures. Their design is primarily based on hydrodynamic stability. However, their structural...
Broke2: A Program for Broken Wire Analysis
A computer program to study the dynamic behavior of an electric transmission line system when wires suddenly break has been developed by the authors. All three of the line elements: the...
Tunnel Closure Prediction by Finite Element Method
Discussed is the tunnel closure prediction of a drainage tunnel using finite element methods. Separately, three finite element programs were used to predict the closure. The results of...
Study of Structural Behavior with Computer Simulation
The application of computer simulated testings of structural elements in the civil engineering undergraduate education is described. With a computer simulation a structural component may...
Glen Canyon Dam's Quick Fix
When the spiullways at Glen Canyon Dam were severely damaged from unexpected flooding in 1983, the Bureau of Reclamation had just 10 months to repair the tunnel spillway lining and build...
What is a Forensic Engineer?
A forensic engineer is one who is concerned with the relationship and application of engineering facts to legal problems. He is an acknowledged expert who investigates construction-related...
Failure Investigations for Forensic Engineering
Failure investigations related to construction Industry is described in detail in the article. A failure investigation is one of the most demanding of engineering undertakings. It requires...
What to Do When a Failure Occurs
When a major building problem involving structural failure occurs, action should begin immediately to determine the damage or failure and detect the underlying problem. This paper will...
Arbitration: A Risky Method for Resolving Disputes
Arbitration has been widely praised as a speedy, 'inexpensive' alternative to litigation for resolving a wide range of disputes, including disputes arising from...
An Historical Perspective of Failures of Civil Engineering Works
The blight of failures has smitten civil engineering works since ancient times. An examination of historic cases reveals relationships to contemporary cases that are useful in guiding...
Failure Classifications
A detailed description of the failure classification with respect to the constructed facilities is presented. Author is of the opinion that most reports of failure even of an extensive...
Data Collection and Information Dissemination: Current Efforts and Challenges
The need for the civil engineering community to collect and disseminate information on failures has been discussed widely. It appears that in recent years our profession's reluctance to...
Construction Insurance: An Alternative Unified Risk Insurance
The transfer of risk mechanism (insurance) can be applied to solve problems unique to the construction environment. The proposed program is worthy of support since all segments of the...