Actual Versus Assumed Behaviour of Girder Bridges
It is generally believed that the discrepancies between calculated and actual responses of bridges can diminish, to the point of being nonexistent, with refinement in the method of analysis....

Rehabilitation of Highway Bridges: Design and Operational Considerations
The design of a rehabilitation of a bridge which must maintain some lanes of traffic requires special consideration of construction procedures and traffic control, which are discussed...

Variability Analysis of Bridge Responses Using the Semi-Continuum Method
The semi-continuum method is used for Monte Carlo simulation of a large number of bridges. It is confirmed that the mean values of responses can be obtained deterministically, and their...

Response of Two-Span Beam to Spatially Varying Earthquake Excitation
The effect of the spatial variation of strong ground motion should be considered in the analysis and design of large structures such as bridges, lifelines, dams, etc. The stochastic response...

Computerized Bridge Coding for HEC-2 Applications on I.B.M. P.C.
A computer program for conversion of survey field notes directly into SB, BT, and GR cards with simultaneous cross-section plot is described. It was designed to simplify the coding of...

Skytrain Crosses the River
The cable stayed bridge that will carry Vancouver's light rail line across the Fraser River is the world's longest such bridge built solely for mass transit....

Priority Integrated Pipe Evaluation
The selection of the most suitable pipe for a given site involves the consideration of many factors affecting pipe performance. The factors to consider in sewer pipe evaluation and selection...

A Multilayered Model for Analysis of Composite Pipes
A multilayered model is developed to analyze the behavior of composite pipes, such as prestressed concrete pipe, to the combined effects of internal pressure and applied loads. The pipe...

An Investigation of Field Performance of Reinforced Plastic Mortar Pipes
Every year many new pipe materials appear on the market for various applications. One of the important factors the design engineer and the user should consider while evaluating new products...

Inspection of Under Bridge Length Culverts
Culverts over 20 feet in span length are classified as bridges and are inspected under the National Bridge Inventory and Inspection Program. Those facilities under bridge length, less...

Pipe Geometry and Pipeline Bridge Wind Oscillation
Static and modal analyses of two pipeline suspension bridges owned by American Natural Resources - the Patterson Loop Aerial Crossing (PLAC) with a span of 850 feet (259 meters) and the...

Rehabilitation of Terminal Ballast Water Piping
In order to maintain the integrity of the ballast water piping system at the Marine Terminal of the trans-Alaska pipeline, a composite lining system was installed in the 42-inch (1,067...

Cables in Trouble
Having inspected more than half of the world's cable stayed bridges, the authors conclude that many are in danger of sudden collapse unless corrosion problems can be stopped....

Design/Construct Contract Speeds Bridge Job
In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask...

Japan Spans the Inland
Japan recently opened the Kojima-Sakaide Route, a 13.1 km series of bridges across the Inland Sea. The route connects two of Japan's four main islands�Honshu and Shikoku....

Lessons from Schoharie Creek
The failure of the Schoharie Creek Bridge in New York State occurred in April 1987. Several investigative panels were commissioned. The failure has been generally attributed to scour,...

Cable Stayed Bridges
Two of these five papers on cable-stayed bridges deal with wind analysis. One develops the theory for motion due to flutter and reaches the conclusion that the vibrations are, in general,...

Analytical Studies of the Schoharie Bridge Failure
Analytical studies consisted of geomorphic, hydrologic, hydraulic, and erosion analyses including mathematical modeling with HEC-1 and WSPRO, the new FHWA water-surface profile model....

Schoharie Creek Bridge Model Study
On April 5, 1987, a major storm occurred in the Schoharie Creek watershed and the resulting flood caused the bridge to fail. The hydraulic model of the bridge was performed to simulate...

Cement-Based Materials for Planetary Facilities
The use of concrete and other materials based on a cementitious matrix is evaluated for the construction of planetary base facilities. Consideration is given to the most recent developments...

 

 

 

 

Return to search