Isotopic and Trace Element Variability in Altered and Unaltered Tuffs at Yucca Mountain, Nevada
Reference stratigraphic sections near Yucca Mountain, Nevada were established and sampled in outcrop areas where the volcanic rocks have been minimally altered. Isotopic and trace element...
Lead Isotopic Composition of Paleozoic and Late Proterozoic Marine Carbonate Rocks in the Vicinity of Yucca Mountain, Nevada
Paleozoic and Late Proterozoic marine carbonate rocks (limestones, dolomites, and their metamorphic equivalents) cropping out in the vicinity of Yucca Mountain contain lead with an isotopic...
Durability Testing of the High-Capacity GA-4/GA-9 Trailer
General Atomics (GA) is under contract to the US Department of Energy (DOE), Idaho Field Office, to develop two legal-weight truck from-reactor spent-fuel shipping casks with trailers....
Stochastic Modelling of Groundwater Flow at the WIPP Site
A stochastic approach to modelling the groundwater flow in the vicinity of the WIPP site in New Mexico is described. A geostatistical model of the transmissivity of the Culebra dolomite...
Fresno/Clovis Water Management Plan
The Fresno/Clovis Metropolitan Area (FCMA) in California has historically relied solely on untreated, undisinfected groundwater as a source of potable water to serve 500,000 people. Contamination...
Urban Water Planning?A Western Nevada Case Study
The result of the increased demands due to population growth in the Reno/Sparks urban area and new uses i.e., environmental and Pyramid Lake related, has created increased competition...
Water Management Plan for Lake Okeechobee
Lake Okeechobee is a large, natural freshwater lake in Southern Florida with a drainage area of about 5,650 square miles. The Corps of Engineers operates and maintains project works on...
Licensing and Permitting the Devil's Nose Project Under the 1990's Regulatory Conditions
Amador County is one of California's mountain counties of the western slope of the Sierra Nevada range in the north central portion of the state. The present population is estimated to...
Partnering in Water Resources Planning in Florida
This paper discusses successful partnering efforts by the Corps of Engineers in water resources development in Florida. The partnering involves the Corps, local project sponsors and other...
Public Process in Fresno/Clovis Water Supply Plan
Groundwater is the principal reservoir for the Fresno/Clovis Metropolitan Area (FCMA) of Central California. However, significant portions of the aquifer are threatened by pesticides and...
Economics of Endangered Salmon in the Pacific Northwest
Economic factors play important roles in designating endangered species and the design of recovery plans. Economics is important irrespective of the role it plays in decisions to classify...
The Economic Value of Trout Fishery Management Programs
The contingent valuation method is used to estimate the economic value of a trout fishing day at the Cache la Poudre River in Colorado. In addition, changes in daily economic value and...
Meeting Instream Flow Needs of Lower Colorado River in Texas
The Lower Colorado River Authority (LCRA), an agency of the State of Texas, manages the surface waters of the lower Colorado River in Texas. The major water supply source in the lower...
Natural, Cultural, & Environmental Resource Values Influencing Colorado River Basin Management
The Colorado River Basin supplies water to the seven western states of Wyoming, Colorado, Utah, Arizona, New Mexico, Nevada, and California, and to Mexico. Originally the Colorado River...
Juanita Creek Channel Restoration?King County, Washington
Juanita Creek, a small basin near Seattle that contains anadromous fish, was experiencing degradation due to urbanization. A detention pond and channel restoration improvements were constructed...
Double Rock Park Stream Restoration Project
The Double Rock Park stream restoration is a pilot project for the Baltimore County, Maryland, Stream Restoration Program. The study assessed watershed conditions and the stream channel...
Use of Flood Control Features for Environmental Mitigation
The US Army Engineer District, Vicksburg (CELMK), plans to construct up to 167 water control structures, 52 confined disposal facilities, and 47 barrow pits as part of a major flood control...
An Isolated Wetland Used for Stormwater Treatment
A marsh used for stormwater management showed gradually increasing levels of pH, dissolved oxygen and conductivity in the flow path. The system was especially effective in removing suspended...
Innovative Wetlands in Urban Settings Using Dredged Material
As a result of its work in the waterways of the nation, the U. S. Army Corps of Engineers (USACE) has restored or constructed wetlands using dredged material in a number of urban/suburban...
Innovative Wetland Re-creation in Urban Setting
The project site is a 106 hectare, mixed-used, commercial development east of Tampa, Florida and at the westerly limit of the town of Brandon, Florida. Delaney Creek traverses the site...
Return to search