Oilcrete
Threatened by probable tightening of hazardous-waste legislation, oil companies are searching for ways to dispose of or stabilize oil-drilling byproducts. One way is cementitious stabilization...
Computer Analysis of Origin-Destination Survey Data in the State Route 55 Travel Corridor, Before and After the Opening of Carpool Lanes
The State Route (SR) 55 carpool lanes in Orange County were opened for high occupancy vehicles (HOV) usage in November, 1985. Since SR 55 was the first travel corridor in Orange County...
Concrete Pipe Trenchless Technology
Precast reinforced concrete pipe is the most commonly used pipe material for jacking operations. For over 90 years, concrete pipe techniques, procedures and applications established the...
Sons of Martha: Civil Engineering Readings in Modern Literature
These three stories excerpted from the new book Sons of Martha, compiled by Augustine J. Fredrich and published by ASCE as the first book in a new venture by the Publications Division, introduce the engineer...
The Great American Pyramid
For more than 50 years officials of Memphis, Tenn. have wanted to establish a link to their Egyptian namesake--and they will, through a pyramid. As opposed to its Egyptian forerunners,...
On the Drawing Board
Reliable and quantitative nondestructive evaluation (NDE) methods for construction materials of wood, concrete, masonry and structural steel are needed. NSF program director John Scalzi...
An Integrated GIS and Model for Assisting the Managers of an Army Training Area
The ARC/INFO geographic information system (GIS) has been combined with the ARX spatial expert system and the SMSP soil moisture-soil strength model to assist the managers of a major training...
Stream Bank Stability Prediction for C6 Stream Type Reconstruction
A hydraulic model investigation will be conducted to evaluate the effects of root system characteristics of three meadow plant communities on simulated bank erosion. The test will determine...
Development of an Underwater Canal Lining Method
The U.S. Bureau of Reclamation is developing a method of lining a large irrigation canal in-place while water flows in the canal, using an impermeable plastic membrane covered with concrete....
An Evaluation of the Large Mammal Entry/Escape Steps Coachella Canal In-Place Lining Project
This study evaluated the effectiveness of a new system of large mammal entry/escape steps as part of the environmental investigations for the Coachella Canal In-place Lining Prototype,...
Environmental Aspects of Water Resources Development
Long-term management of resources requires a comprehensive anlysis of the effects that development and management of one resource may be expected to exert upon other resources. However,...
Rheological Analysis of Fine-Grained Natural Debris-Flow Material
Experiments were conducted on large samples of fine-grained material (?2mm) from a natural debris flow using a wide-gap concentric-cylinder viscometer. The rheological behavior of this...
Unsteady Flow of Bingham Viscoplastic Material in an Open Channel
An analytic solution for transient flow of a Bingham viscoplastic material in an open channel is presented. The solution for the response to a time-varying pressure gradient predicts shear...
Conceptual Evaluation of Dam Safety by Instrumentation
The criteria governing the design of dams can frequently be imprecise. One of the most practical methods of evaluating dam safety in the dam safety surveillance programs is to check the...
Stabilization of an Alluvial Channel in an Urbanized Area
Grade stabilization structures have been used for many years to control degradation of alluvial stream in the southwest. These structures result in reducing the gradient of the stream...
Effects of Spillway Operation on Cavitation Damage to Hugh Keenleyside Dam Spillway
The Hugh Keenleyside Dam (also known as Arrow Dam) is located on the Columbia River, at the outlet of Lower Arrow Lake, 53 km north of the Canada - U.S.A. border. The project has been...
Minimizing Erosion Damage to Embankments, Spillways, and Channels With Articulated Concrete Block Revetment Systems
The results of a multi-year applied research and testing program, focusing on the hydraulic performance of various types of erosion control products and revetment systems in steep-slope...
Chute Design Using Concrete Building Blocks
Chutes constructed using concrete building blocks for erosion control on ephemeral streams have performed successfully. The chutes consist of a layer of blocks placed on a geotextile over...
CCM Overtopping Protection on Three Parkway Dams
Cellular concrete mat (CCM) overtopping protection systems have been designed for and will be installed on three small embankment dams along the Blue Ridge Parkway. Based on recent field...
Overtopping Protection for Embankment Dams
Modifications that allow safe overtopping during large flood events can be made to existing embankment dams. These modifications are on the leading edge of technology and require special...
Return to search