The Use of Aragonite as an Alternate Source of Beach Fill in Southeast Florida
The first full-scale use in the United States of imported aragonite sand for beach restoration was initiated at Fisher Island, Florida, in December, 1990. The project involved placement...

Cross-Shore Sediment Transport Determined by EOF Method
Laboratory and field data of beach profile changes are used to study the cross-shore transport rate. The Empirical Orthogonal Eigenfunction analysis is applied to separate the temporal...

Higher Frequency Acoustic Measurements of Coarse Bedload Transport
Although sensors have been developed which provide high temporal resolution for the measurement of wave profiles, flow fields and suspended sediment concentrations within the coastal system,...

Integrated Photogrammetric and Geophysical Monitoring of Shoreline Instability in Littoral Cells in the Pacific Northwest, USA
Several factors have recently focused on the attention of government agencies, academic researchers, and the general public on coastal erosion and beach resource management in the Pacific...

Coastal Sediment Budget Analysis Techniques
Sediment budget analysis techniques developed by the U.S. Army Corps of Engineers Wilmington District are described. The basic procedure combines information on shoreline and tidal inlet...

Coastal Process Study on Beacon Shoreline
A sediment budget was developed for the Santa Barbara and Ventura County shoreline in Southern California as part of an overall coastal planning effort. The budget was analyzed primarily...

The Santa Cruz Littoral Cell: Difficulties in Quantifying a Coastal Sediment Budget
Beach compartments or littoral cells form the framework for our understanding of the sources, transport, sinks, and storage of sand in the nearshore zone. In general, along the California...

Waenhuiskrans: Sediment Budget and Reactivation of a Sediment Pathway
Erosion of beaches due to historical dune stabilisation work carried out at Waenhuiskrans, a holiday village on the south-east coast of South Africa, prompted the need for the reactivation...

The Ebro Delta Project: A First Sediment Budget
In this paper, a sedimentary budget for the Ebro delta coast in the Western Mediterranean is presented. Calculations have been performed after one year of field campaign. The main result...

Characteristics of Colloids in Landfill Leachate
Leachate was collected from a municipal landfill which has been closed for about 15 years. The sample was collected (under a N2 atmosphere) only...

High Level Radioactive Waste Management 1991
The proceedings of the second annual international conference on High Level Radioactive Waste Management, held on April 28 - May 3, 1991, Las Vegas, Nevada, provides information on the...

Probing the Golden Gate
The Golden Gate Bridge has just come through the most detailed analysis ever attempted in its 53-year-old history. This analysis was squeezed into a desktop computer that calculates twice...

B.C. Hydro's Practice for Assessing the Foundations of Existing Dams on Rock
Since the early 1980's B.C. Hydro has carried out dam safety reviews which included 33 gravity and embankment dams founded on rock. The foundations include moderately jointed,...

Innovative Design for Diversion
A conventional diversion scheme to facilitate construction of the 120 m high rockfill dam for the Beni Haroun project in Algeria would have required three 10 m diameter diversion tunnels....

Consideration of Sedimentation on Hydropower Projects
Experience gained by analysis of a number of hydropower projects throughout the world leads to the conclusion that it is necessary to consider sediment related aspects in the design and...

Cone Penetration Testing: Cost Effective Soil Exploration
On reviewing the 1987 Part 12 Dam Safety Inspection Reports for the Wisconsin River Power Company's Petenwell and Castle Rock Dams, the Federal Energy Regulatory Commission...

Raising of King Talal Dam
The King Talal Project is located on the Zarqa River, a Jordan River tributary, in Jordan. An existing embankment dam, 100 m high, built in the mid-seventies by the Jordan Valley Authority...

Rocky Mountain Project Conceptual Design of Upper Reservoir
The 9300 acre-foot upper reservoir for the Rocky Mountain Project will be formed by an 80-ft high ring dam with a crest length of 12,800 feet. Sandstone and shale of the Pottsville formation...

Through-Flow Analysis for Rockfill Dam Stability Evaluations
Existing rockfill dams may have spillways that are not adequate to pass the current probable maximum flood (PMF), having been designed prior to the publication of the latest Hydrometeorological...

Rehabilitation of Dams, Spillways, and Hydroplants
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Concerns include deterioration of original construction materials,...

 

 

 

 

Return to search