Seismic Design Issues for Immersed Tube Tunnels
This paper provides an overview of the issues and the state of the art techniques in the seismic design of immersed tube tunnels (ITT). Particular focus is given to the ITT presently planned...

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

3D Computer Modeling & Animation for Marketing of Project Services
Three-dimensional (3D) computer modeling and animation are increasingly being utilized in the Engineering and Construction industry for the marketing of project services. Like 2D, 3D modeling...

The Impact of User Interfaces on CAD Systems
The generation of architectural layouts through knowledge-based techniques forms a notable focus in design research efforts. A significant aspect of this research centers upon the development...

Electronic Communication Between Project Participants
Fragmentation in the U.S. construction industry is perceived as one of the major contributors to reduced productivity. Lack of communication may be the main difficulty. Communication is...

Site Layout: Where Should it Go?
Site layout is mostly treated as a task independent of other resource allocation tasks such as those that are traditionally associated with construction planning and scheduling. Yet, the...

Resource-Driven Scheduling
As the project management techniques get applied to more and more human resource intensive projects, the topic of more effective resource planning has become one of the major issues in...

3-D Positioning for Construction Surveying and Automation
Three-dimensional real-time positioning is a critical requirement to allow for improved surveying and autonomous vehicle control. Given such a system and a project data link, multiple...

Smart Exception Reporting
Project control systems that contain a degree of 'intelligence' are possible with today's technologies. At the same time project controls engineers...

A Knowledge Engr. System for Inquiry Feedback P.M.
The Knowledge Engineering Computer System for Inquiry Feedback Project Management was developed to augment existing project control systems by determining possible causes for delays and...

Partnering on the Bonneville Navigation Lock
The Portland District of the Corps of Engineers has found partnering to be a valuable technique for contract and project management. This paper presents details of the execution of the...

Contractor View of Partnering on Bonneville Lock
Kiewit Pacific is building a high-risk lock project for the Portland District of the Corps of Engineers. We are participating in a partnering technique for contract management. Partnering...

Designing Plans for Constructability
The writer has obtained several years experience acting as construction engineer for roadway rehabilitation projects as a consulting engineer. In this capacity, it is necessary to provide...

The Debate Over Large Dams
Dam megaprojects across the globe are under increasing scrutiny. Critics say large dams have clearly lost their luster. While the outcry over huge public subsidies and high ecological...

Waterpower '91
A New View of Hydro Resources
This proceedings, Waterpower '91: a New View of Hydro Resources, consists of papers presented at WATERPOWER '91 Conference...

Avoiding Defective Specifications
Despite everyone's best efforts, the design intent as portrayed in the contract documents is rarely crystal clear. As a result, the owner and the project team often find themselves...

Ground-Water Modeling Without Fear
Computerized ground-water modeling has leapt from the cloistered laboratory to the field project as more and more programs are written for the personal computer. These easy-to-understand...

Kuwait: The Incredible Shrinking Rehab
With rehabilitation estimates now just 20% of what they first were, the liberation of Kuwait has not been a cure-all for the construction industry. Firms participating in the emergency...

Determination and Presentation of Subsurface Conditions for Design and Construction
A major problem in the design and construction of many engineering projects is the lack of adequate geotechnical information both for design and for determining conditions to be encountered...

Regional Water Supply Needs and Sources, Southwest Florida Water Management District
In 1990, the Southwest Florida Water Management District completed a district-wide water supply needs and sources planning analysis. The SWFWMD needs and sources analysis identifies water...

 

 

 

 

Return to search