Probabilistic Scheduling of Cavitation Repairs
The probabilistic nature of maintenance scheduling is exemplified by operating histories and conditions which vary from unit to unit. Typically, an operator must decide whether to repair...

The Unusual History of a Flowline Canal Within a Reservoir
This paper discusses the history of and remedial repairs to a flowline canal which carries water from the headwater of Lake Isabella in California to Southern California Edison Company's...

The Zebra Mussel Invasion Niagara Power Project
The zebra mussel is a prolific mollusk that has recently invaded the Great Lakes region. It has a proven track record for causing severe macrofouling at power utilities and water municipalities....

Hydro Plant Modernization and Uprating
The paper suggests that the method to achieve desirable hydropower benefits at costs lower than for new thermal projects, is through systematic modernization and upgrading of older hydro...

R. H. Saunders GS?Propeller Turbine Runner Replacement Project Outline and Model Development
Ontario Hydro's operating philosophy is to operate all of its facilities in an optimum manner. The basic rationale for upgrading this plant is to maximize its energy potential...

Robert Moses Procurement and Model Tests ? A Contractor's Perspective
This paper discusses (1) the need to provide realistic cost/benefit evaluation criteria in turbine bid specifications and (2) the benefits of competitive model testing. Recent procurement...

Challenges in the Design and Manufacture of Small Replacement Runners
The increasing trend within the hydro industry to achieve additional capacity and/or energy through runner replacement has brought with it new challenges for the turbine manufacturer....

Rehabilitation of the Historic Ocoee 1 Hydro Power Plant
The Ocoee 1 Hydro Plant is located on the Ocoee River 16 miles east of Cleveland, Tennessee. Built by the East Tennessee Power Company, it was placed in commercial operation in 1912. There...

Ashton Hydroelectric Project Rehabilitation
This paper presents the project experience of rehabilitating the 70-year old Ashton power house and performing the dam design modifications to pass the increased probable maximum flood....

Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...

The Twin Vortex Draft Tube Surge
Recent studies conducted at Colorado State University using a model of the 700-MW turbines at the U.S. Bureau of Reclamation's Grand Coulee Third Powerplant indicate that...

Deflector Plate Turbine Aeration?Case Studies
Water quality requirements have become a focal point in recent re-licensing of hydroelectric projects. The Federal Energy Regulatory Commission has significantly increased the relevance...

Performance Analysis of Multipath Acoustic Flowmeters Under Various Hydraulic Conditions
Multipath, crossed plane acoustic flowmeters are being increasingly used for hydroelectric turbine efficiency measurement both for acceptance testing and efficiency mapping of units in...

Hydropower Research: The University Perspective
University hydraulic laboratories have provided applied research services for the hydropower community for many years. It is the contention of this paper that only limited technology transfer...

Waterpower 91?Laboratory Investigation of Syphon Intakes
The Federal Department of Energy, Mines and Resources (Canada) has funded four separate investigations of syphon hydro technology. These study phases, which were carried out by Acres Hydraulic...

Development of an Eicher Screen at the Elwha Dam Hydroelectric Project
The Eicher Screen is a relatively new concept for screening juvenile fish out of hydroelectric turbine penstocks. The concept was developed by Mr. George Eicher and one was recently installed...

Fish Bypass System Mathematical Models
Mathematical models for fish diversion systems based on fish behavior in conjunction with diversion system structural and hydraulic properties are developed. Guidance efficiency is described...

Hydroacoustic Evaluation of Deep and Shallow Spill as a Bypass Mechanism for Downstream Migrating Salmon at Rock Island Dam on the Columbia River
Hydroacoustic data were collected on downstream migrating juvenile salmon (Oncorhynchus spp.) during the springs of 1983 and 1984, and summer 1990 at Rock Island Dam on the Columbia River...

Design Concepts for Vertical Kaplan Turbines
In this paper, some general aspects as well as selected design details of vertical Kaplan turbines are presented. The Monroe Street project which is under construction right now serves...

Rocky Mountain Pump-Turbines and Related Mechanical Equipment
The Rocky Mountain powerplant will have three reversible, single stage, vertical shaft pump-turbine units, each having a maximum output of 321 MW generating and a maximum pumping capacity...

 

 

 

 

Return to search