A Review of the Cross-Flow Turbine
The historical development of the cross-flow turbine is briefly presented together with a summary of the well-documented one-dimensional theory. Two-dimensional aspects of runner design...

Dolores Pumped-Storage Unit?A Case Study in Planning
The Durango Projects Office of the U. S. Bureau of Reclamation (Reclamation) conducted a pumped-storage investigation from 1981 to 1983 on a site in southwestern Colorado. This paper describes...

Unique Civil Engineering Features of the Balsam Meadow Pumped-Storage Project
The Balsam Meadow Pumped-Storage Project for the Southern California Edison Company is located in the Sierra Nevada Mountains approximately 55 miles northeast of Fresno, California. The...

Innovative Approach to New Water Supply/Power Development
Since the first deliveries made by the State Water Project (SWP) in the early 1960's the State of California has become known worldwide as a pioneer in the development of...

The Pacific Northwest Hydropower Data Base Study
The Hydropower Data Base is presently a functional tool for evaluating hydropower in the Northwest. It is a complete system which has been implemented using a variety of crosschecks and...

Friant Power Project: Design and Construction?Non-Federal Power at a Reclamation Facility
Friant Dam, Millerton Reservoir, provides the principal water supply for the Friant Division Central Valley Project of the U. S. Bureau of Reclamation (Bureau). The dam is a 319-foot high...

Construction of Yellowtail Dam & Power Plant 63-65
The Yellowtail Unit of the Missouri River Basin project is located on the Bighorn River in south central Montana. The key feature of the unit is Yellowtail Dam which rises 525 ft. between...

Roller Compacted Concrete and Tunnel Boring Machines?Two Tools for Designers and Planners
Two tools that have come into use fairly recently are roller compacted concrete and tunnel boring machines. These new tools can significantly affect the ability to make new projects cost...

Micro PAT-Synchronous Generator Unit for Isolated Power Supply at Sultan Project Dam
The paper describes a unique application of a micro-PAT Unit installation utilizing downstream release flows for providing an isolated power supply at the Jackson (Sultan) dam in Washington...

Economic Evaluation of Alternative Electric Power Developments
A hydroelectric-dominated power system and a thermal-dominated system represent different ways of meeting total electric demand, but with materially different cash flow patterns. This...

The Diamond Fork Power Development Experience
Federal water development agencies are, to varying degrees, currently seeking financing partnership arrangements with states and other non-federal entities for up-front construction and...

Financing the Town Bluff Hydropower Project
The Town Bluff Dam Hydropower Project is the first new Federal hydropower project to be completely financed by a non-Federal entity where all of the construction funds would be provided...

A Cost-Sharing Alternative for Federal-Private Water Projects
A proposed cost-sharing alternative for financing of a joint Federal-State multipurpose water project is presented. The philosophy of recent and present Federal administrations on non-Federal...

Solar Ponds for Power and Water Quality Control
The status is provided on a solar pond test project in which the Bureau of Reclamation is involved in a cooperative effort with UTEP (The University of Texas at El Paso), Bruce Foods Corporation,...

The PowerBarge?Portable Hydro for the Third World
The PowerBarge concept consists of a floating intake, siphon penstock, and floating generating station for use at new or existing low-head dams. Apart from access, mooring facilities,...

Hydroturbine Intake and Penstock Geometry Design
This paper studies the intake design of one hydroturbine site and the penstock trifurcation design of another site. A hydroturbine site had been built and was in operation when vortexing...

Open Flume Turbine Intake Geometry
An inexpensive physical hydraulic model was used to investigate the geometry of two different open flume turbine intakes. One intake utilized an inverted, fabricated pump bell type of...

Leakage from Pressure Tunnels and Shafts
Several issues related to leakage from unlined pressure tunnels and shafts are reviewed and discussed. They include confinement, or cover requirements relative to hydraulic jacking of...

Analysis and Testing of Transient Pressures at Camp Far West Hydroelectric Project
The objective of this paper is to present a comparative discussion of the results of theoretical analysis of transient pressures and of field tests performed on the Camp Far West Hydroelectric...

Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...

 

 

 

 

Return to search