For the Duration
The U.S. Army Corps of Engineers developed a new grouting method called duration grouting when constructing the foundations for the Portugues Dam in Ponce, Puerto Rico. The site is marked...

Construction Control for Earth and Rockfill Dams
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 27 This manual provides critical guidance for constructors...

Seattle Solutions
Many of Seattle's most important bridges are vulnerable to serious damage if a much-anticipated big earthquake hits. A city-wide study designated lifeline structures for retrofitting,...

Preparing for Pier A
Earthquakes, oil wells, contamination and unstable soil were among the challenges engineers faced as they prepared a site at California's port of Long Beach for the Pier A...

Inspecting the Unknown (Available in Geo-Environmental Special Issue Only)
Unknown foundations have plagued civil engineers for years. In the case of underwater pilings, much time and money is spent inspecting for cracks, breaks or deterioration. Even then, visibility...

The Deep (Available in Geo-Environmental Special Issue only)
Despite a mere 1,500 ft separation, Baltimore's Oriole Park at Camden Yards and Ravens Stadium required vastly different deep foundation solutions. While Oriole Park is founded...

Rebuilding History
Deterioration of the second-oldest multiple-arch masonry viaduct in the country�in Canton, Mass.�threatened its ability to continue carrying Amtrak's Northeast Corridor trains,...

Effects of Construction on Structures
This proceedings, Effects of Construction on Structures, consists of papers presented at two sessions of Geo-Congress '98 sponsored...

Geosynthetics in Foundation Reinforcement and Erosion Control Systems
The variety and number of applications of geosynthetics in goetechnical engineering continues to grow rapidly. This proceedings focuses on two specific applications: soil reinforcement...

Shake, Rattle and Hold (Available in Structural Engineering Special Issue Only)
In-situ lateral load tests of two bridge bents were conducted on Interstate 15 in Salt Lake City, Utah, to determine the strength and ductility of an existing concrete bridge and the improvements...

Opportunities in Asia
An Assessment of Construction Trends, Needs, and Potential Collaborations
Prepared by Civil Engineering Research Foundation. This book presents findings of a 1996 technology assessment mission to East Asia that examined the...

Compensation Grouting
To minimize ground movement while tunneling a sewer 5 m below Toronto's Spadina subway line, engineers used special instrumentation, tunneling control and grouting to limit...

Putting On Your Safety Cap
Geomembranes are an important part of landfill cap design. However not all geomembrane liners are created equal, and it's best to know what a liner is made of before specifying...

Game, Set and Match (Available Only in Geoenvironmental Special Issue)
The U.S. Open, which takes place in New York City at the end of August each year, is one of four prestigious Grand Slam tennis events drawing players and fans from around the world, and...

Bump At the End of the Bridge
Interface bumps between bridge abutments and embankments increase risk and add over $100 million to maintenance expenses every year. New research reveals effective ways to deal with the...

Recycling Penn Forest Dam
Almost since it's construction more than 30 years ago, the Penn Forest Dam had suffered severe seepage, leading officials in Bethlehem, Penn., to wonder how secure their largest...

Preparing for Repair (Available only in Geoenvironmental Special Issue)
The Sacramento River Water Treatment Plant, Sacramento, Calif., was built in 1924 and hadn't been upgraded since 1958. In 1996, the city of Sacramento, the owner of the plant,...

Los Angeles Metro-TBM Starter Tunnels-Mixed Face Conditions
Twin TBM starter tunnerls with mixed face conditions were successfully mined by roadheader with steel rib and shotcrete initial support beneath the Hollywood Freeway. Tunneling and total...

Rubber Meets the Road in Maine
Maine design engineers working on a $42 million highway project, faced several settlement problems in the alignment's soft soil. One of their solutions was to use 500,000...

Innovative Design and Construction for Foundations and Substructures Subject to Freezing and Frost
This proceedings, Innovative Design and Construction for Foundations and Substructures Subject to Freezing and Frost, consists of papers presented...

 

 

 

 

Return to search