Los Angeles Metro-TBM Starter Tunnels-Mixed Face Conditions

by Gary J. E. Kramer, P.E.,
Jess Albino, P.E.,



Document Type: Proceeding Paper

Part of: Construction Congress V: Managing Engineered Construction in Expanding Global Markets

Abstract:

Twin TBM starter tunnerls with mixed face conditions were successfully mined by roadheader with steel rib and shotcrete initial support beneath the Hollywood Freeway. Tunneling and total settlements were controlled through chemical grouting, controlled advance lengths, timely installation of ground support, responsive monitoring and appropriate mitigation to adverse trends. Despite a late start date to starter tunnel mining, work was advanced so that TBM mining commenced on the originally scheduled date.



Subject Headings: Tunnels | Tunneling | Soil settlement | Highways and roads | Chemical grouting | Awards and prizes | Urban areas | California | United States | Los Angeles

Services: Buy this book/Buy this article

 

Return to search