Fisheries Planning for Northern Territory, Australia
On behalf of Northern Territory Government the consultants have studied the potential for development and reviewed the present infrastructure. Opportunities as well as constraints to development...

Anadromous Fish Impacts at Proposed Hydroelectric Plants
This paper describes a series of field techniques successfully used by the authors to determine a minimum flow downstream of hydroelectric plants. The minimum flow of water required for...

Zooplankton Entrainment Evaluation in a Power Plant Station
The impact study on the Setubal thermal plant included an evaluation of the plant's effects on zooplankton in the outlet area. After entrainment in the cooling system there...

Litigating the Invisible Boundaries of Tidelands and Wetlands
The author urges uniformity in standards for establishing the two invisible lines that are dominant in coastal law, i. e. , the main high water line and the wetlands line. A high degree...

Beneficial Use of Municipal Sewage in the Ocean
When sewage sludges and effluents are introduced in a properly controlled manner, they can be of benefit to large areas of the ocean. For example, benthic biomass and growth rates of commercially-valuable...

Coral Reef Modeling: Key Largo Case Study
A numerical model called CORALSIM has been developed for the Key Largo Coral Reef National Marine Sanctuary in the Florida Keys. The model was developed as a management tool to study the...

Waterfront Projects and the N.J. Green Acres Program
Under the New Jersey Department of Environmental Protection, the Green Acres program has been at the forefront of the state's commitment to open up its beaches as well as...

Off-Site Water Quality or On-Site Productivity
Nonpoint sources of pollution are being recognized as the primary source of water quality degradation in many coastal areas. In those areas where management programs are being implemented,...

A Study of Selected Environmental Parameters of Small Coastal Lagoons as a Function of Extent of Urban Development, Hydraulics of the Tidal Inlet, and Hydrology of the Contributing Drainage Area
In coastal areas many small brackish water lagoons or embayments connected to the sea by small tidal inlets are at tractive to residential and commercial developers, especially those emphasizing...

Federal Policies in Water Resources Planning
The adequacy of current federal policies and institutional arrangements for water resources planning is assessed. Conclusions and recommendations are presented in five key areas: (1) Water...

Watershed Management in the Eighties
The papers included in this publication discuss state-of-the-art methods and current research on management and present case studies on current projects and practices on applied watershed...

Hydraulic Fill Dam Made Earthquake Resistant
San Pablo Dam, near the San Andreas fault, constructed in 1919-21 by hydraulic fill methods, was found to be susceptible in places to liquefaction under seismic loading. The dam has been...

Coping with Litigation
Engineers should learn legal philosophy, even though it seems unrelated to traditional technical practice. Monitoring changes in legal theory that may increase engineers'...

Tapping Deep Water Resources
Lena is the first commercial guyed tower. Its jacket is the longest ever fabricated, loaded out and launched in one piece. Lena stands in 1,000 ft deep water and has a three-level oil...

Project Mixes Oil and Water
The Prudhoe Bay Seawater Treatment Plant was nominated for an OCEA award, for its potential to coax from Alaska's north slope 1 billion barrels of oil which otherwise would...

Construction-Induced Dynamic Pressure and Corresponding Impact Factors for Pipelines
The Bureau of Reclamation, U. S. Department of the Interior, conducted a study which measured pressure exerted by construction scrapers on a rigid, buried, instrumented concrete slab....

Effects of Vehicles on Buried, High-Pressure Pipe
The mechanical effects of selected types of traffic on buried, high-pressure steel pipe are examined. Particularly considered is a section of the Colorado Interstate Gas (CIG) pipeline...

An Instrumented Soil-Pipe System: Automated Data Acquisition and Management
A 16-in. natural gas pipeline near Racine, Wisconsin, had been in service for some 30 years. In 1982 road widening operations on a line parallel with the pipe resulted in a heavily trafficked...

Sewer Construction Inspection and Testing
Sewer construction testing is the final portion of the team effort that started with the goal of meeting the requirement for a sewer system for the protection of health and environment....

Failure of a Large Reinforced Concrete Pipeline
This paper describes the damage that occurred when a landslide overloaded an 11 ft diameter reinforced concrete pipeline. The 8 ft lengths of pipe, each of 11. 5-in. wall thickness, were...

 

 

 

 

Return to search