Optimal Dispatch of Hydroelectric Systems
This paper presents a reliable and computationally efficient method for solving the optimal hydro dispatch problem. Moreover, this method guarantees a true optimal solution when the units'...

Increasing Hydropower Operating Efficiency
A method is described for determining the most efficient use of hydro units in a multiple unit hydro plant. In a multi-unit plant enough flexibility exists to load a chosen set of units...

Quantifying the Maximum Capability of Hydroplants
A procedure was developed to quantify the maximum hydropower capability. This procedure basically consists of two steps: dividing the total available water into weekday and weekend components;...

Hydro System Enhancement: TVA's Comprehensive Hydropower Program
The Tennessee Valley Authority's Comprehensive Hydropower Program is systematically identifying opportunities for increasing hydroelectric generation in five areas: small...

HYPOS?Hourly System Hydropower Scheduling
HYPOS (Hydro Power Scheduling) is a modification of the program HYPO as presented at Waterpower 81. HYPOS is an interactive system which allows schedulers to assign hourly power generation...

Impacts of Indexed Sequential Hydrological Modeling on Hydrogeneration Capacity Estimation
Indexed sequential modeling (ISM) has been proposed by the Western Area Power Administration as an alternative approach to developing firm marketable capacity (i. e. , project dependable...

Planning of Hydropower Development in Hydrothermal Systems by Capex
This paper discusses the power generation expansion model CAPEX in which provisions are made that specifically account for the distinct characteristics of hydropower. The model determines...

Water Availability for Energy Development in the Upper Colorado River Basin
The Bureau of Reclamation is investigating, for planning purposes through hydrologic determination, the total allowable depletion level in the Upper Colorado River Basin. The Colorado...

Seismic Isolation System for a Floating Dry Dock
The seismic isolation system consists of two dolphins, each a relatively large-diameter cantilevered steel pipe pile anchored in Franciscan rock, and buffered connections to the floating...

LRFD Format for Transmission Structures
The structural design of high voltage electric transmission lines in the US is usually governed by the National Electrical Safety Code (NESC). A simple reliability-based Load and Resistance...

Wind Loads on Electrical Transmission Structures
Guidelines for structural loads on electrical transmission structures were prepared by the American Society of Civil Engineers' Committee on Electrical Transmission Structures....

A Field Study of Wind-Induced Conductor Loads
A 161 kV steel pole line in Omaha, Nebraska, is instrumented to provide conductor load field data due to climatic events. Various transducers and monitoring equipment used for data acquisition...

Steel Poles?Past, Present and Future
When using steel pole structures, construction possibilities are limitless. Of all the options available, tubular steel structures provide the most versatility for transmission line construction....

Lattice Tower Design Using Cold-Formed Shapes
The use of cold-formed shapes in lieu of hot-rolled angles may lead to major changes in the design of lattice transmission towers. The design procedure of the new shapes is more creative,...

Innovations in Prestressed Concrete Structures
Prestressed concrete poles are probably the best choice for most transmission line structures. They have many advantages over structures made from other materials for both engineering...

Cold-Formed Angles for Transmission Towers
Cold-formed members enable the engineer to design transmission towers that may be more cost-effective than those built with hot-rolled angles. Members can be designed to closely fit the...

Design and Test of Cold Formed Steel Members
Latticed systems represent the most spread and low-cost solution for electrical trasmission towers, when ground conditions do not affect the design choice. Steel angles have been used...

Bolted Connections for Steel Towers
Laced electrical transmission towers require on-site assembly. Consequently, the number of bolts and pieces are important considerations in the total cost of the structures. ASTM A394(1)...

IEEE/ASCE TransmissionStructure Foundation Design Guide
The American Society of Civil Engineers' (ASCE) Subcommittee on Foundation Design for High-Voltage Transmission Structures was formed in October 1976. The purpose of the Subcommittee...

TLMRF Research Initiatives
The research initiatives of the EPRI (Electric Power Research Institute) structural development project RP2016-03 are described. The interrelationship of these initiatives with cosponsored...

 

 

 

 

Return to search