Master Plan for Rehabilitation, Modernization and Expansion of the Port of Suez
Rehabilitation and expansion of the Port of Suez, started in 1977, has been an ongoing process for the last eight years and is continuing. As a result of detailed planning of facility...

Financial Analysis of Port Facilities
This paper describes a spreadsheet-based structure for financial analysis of port facilities and services, designed for use as a planning tool by non-specialist port managers. The paper...

Port Master Plans and Feasibility Studies
Port projects are cost-intensive long-life irreversible assets, and developing countries particularly limping with resource constraints could not afford the luxury of short-sighted defective...

Gabon Mineral Port Planning
There has been increasing interest in the use of topping-off and top-loading vessel transport systems to ease the burden of expenditures for deepening harbors to fully load large vessels....

Port Planning after Earthquake Damage
The earthquake of March 1985 affected two important ports in Chile: Valparaiso and San Antonio. While emergency measures succeeded in solving immediate operational problems, there remain...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Terminal 18 Entry Facility?Port of Seattle
This paper presents a successful approach that was used in the planning, design, permit coordination, and expansion of the entry/exit facilities at Terminals 18 and 20 at the Port of Seattle....

Conversion of Keppel Wharves Conventional Berths 42 & 43 to Container Berths C13 and C14, Singapore
With further growth of container traffic expected in the 80's the need for additional facilities was apparent. Following an evaluation of available alternative sites, it was...

Tacoma Terminals Pier Designed for Economy
This pier is a representative and highly refined sample of what is known as the Puget Sound system of construction, an economical system that maintains the durability necessary in the...

Carnation Terminal, Oakland?Preliminary Design
The Preliminary Design process is examined as it was applied to design of wharves for a new container terminal in the Port of Oakland, California. The process includes active interdisciplinary...

Port of Long Beach Supertanker Terminal
The supertanker marine terminal and crude-oil transfer facility at Berth 121 on Pier E in the Port of Long Beach, California is the largest tanker-handling berth on the West Coast. This...

The Pacific Texas Pipeline Project?Deepwater Oil Terminal, Port of Los Angeles
This paper describes the implementation program and status of the Pacific Texas Pipeline Company project in the Port of Los Angeles. A brief description of this important 1. 6 billion,...

Installation of the Port of Singapore's SPM System
To achieve an increase in refining capacity from 70,000 barrels per day to 170,000 barrels per day, a local oil refining company entered into an agreement with the Port of Singapore Authority...

Trends in Containerships and Their Impact on Terminal Design
A revolution in ocean shipping operations, affecting both landside equipment and cargo handling methods, is underway. In today's container shipping industry, maximum efficiency...

Terminal Development as Affected by New Generation Ships
Howland Hook Marine Terminal, New York, serves to illustrate how an existing terminal, built to the older standards, can be adapted to accommodate these larger ships that not only stretch...

Dual Hoist Container Cranes for Virginia Port Authority
The dual hoist container crane has proven to be substantially more productive than conventional container cranes. Virginia Port Authority has purchased three new dual hoist cranes with...

Container Wharves Supported on All Vertical Piles Embedded in Rock-Fill Dikes
In recent years, several container wharves have been planned and/or constructed which feature the construction of the wharf over a sloping rock-fill dike. The wharves utilize all vertical...

Water Use Planning�Boston Harbor
This paper establishes a methodology for harbor planning based on comprehensively evaluating the water resource, categorizing the vessels which use the harbor, and prioritizing locational...

Geotechnical Aspects of Waterfront Parks: Case Histories
This paper presents several case histories of waterfront developments, and describes the general approach that the geotechnical consultant should take in the design of these projects....

South Beach Harbor Project: Redevelopment of the San Francisco Waterfront
The redevelopment of a portion of San Francisco's Northern Waterfront is recounted, describing the planning and design process used to take an area of obsolete maritime facilities...

 

 

 

 