Costs of Truck Related Highway Damage to Alaska
The cost of pavement damage to the State of Alaska for truck traffic continues to be a very controversial topic. There is no simple answer since this cost is dependent upon pavement strength,...
The CBR Test Applied to Processed and Compacted Snow
The processes used during the past two decades to improve the snow bear a modest resemblance to conventional flexible pavement construction, thus the field CBR (California Bearing Ratio)...
Ground Temperature Monitoring Cominco's Red Dog Project
Procedures are available in the literature for estimating subsurface thermal characteristics of foundation soils in cold regions using published climatic characteristics for a given area....
Snow Load Design for Colorado Mountains
During the past decade, Colorado mountain construction has experienced a period of rapid growth. New ski resorts and other business developments have resulted in many new facilities. For...
Characterization of the Dalton Highway Foundation Soils
A case study is presented of the landform-based probabilistic-statistical route geotechnical characterization of natural foundation soils along the Dalton Highway. Landforms were mapped...
Cold Regions Features of the Whittier Access Tunnel
A feasibility study and cost estimate has been prepared for a vehicular tunnel which would form a portion of a highway between the town of Whittier, Alaska and the east side of the Kenai...
Anchorage Taps Eklutna Lake for New Water Supply
The 170 million Eklutna Water Project will furnish water to Anchorage, Alaska by the summer of 1988. The project consists of an 8,500-foot long diversion tunnel, 6 miles of 54 to 60-inch...
An Overview of Cold Region Considerations for the Design of the Eklutna Water Project
The paper presents a brief overview of cold regions considerations that were considered during the design of the various elements of the Eklutna Water Project in Anchorage, Alaska. The...
Water Treatment Facility Design for a Glacial Lake
The Municipality of Anchorage, Alaska has undertaken a major water supply project, the Eklutna Water Project, to satisfy the growing water demands of Anchorage. The source of raw water,...
Evaluation of Sewage Treatment Requirements in Cold Regions: Case Study?City of Whitehorse
This paper describes a method available for evaluating sewage treatment requirements in cold regions. The City of Whitehorse wastewater management situation has been used as an example...
Wastewater Plant Cold Weather Operational Problems
A questionnaire survey was conducted at biological wastewater treatment facilities in northern New England. Problems associated with various unit processes, due to cold weather operations,...
Proposed Operation of an Expert System for Analyzing Construction Project Risks
The principal problem for the construction project manager is selecting the most effective response when project progress deviates undesirably from targeted objectives. Optimally, the...
Structural and Architectural Maintenance Management by Micro-computer
When a new Senior Vice-President for University College, the nonmedical portion of the University of Alabama at Birmingham, was appointed in 1984, one of the problems encountered by the...
Structural Design Optimization of Nonlinear Response With Adina
Procedures for sensitivity analysis and optimization of nonlinear structural systems with the computer program ADINA are described. Formulation of the structural optimization problem and...
Tiedback Walls Untie Intersection
The intersection of Gallows Rd. and Arlington Blvd. in Virginia's Fairfax County required separation. Tiedback retaining walls, which required only 18 in. instead of the 18-22...
Glen Canyon Dam's Quick Fix
When the spiullways at Glen Canyon Dam were severely damaged from unexpected flooding in 1983, the Bureau of Reclamation had just 10 months to repair the tunnel spillway lining and build...
Can Your Design Be Built?
A constructibility review takes place in the concept stage, preferably before the project design is completed. The reviewers usually are contractors or project engineers who have a great...
Water and Wastewater, Time to Automate?
Water and wastewater engineers have been slow to adopt a full circle systems approach to automated monitoring and control. Such a technical tactic for controlling water and wastewater...
Construction Company Builds a Computer System
The case history of the computerization of a construction company is presented. The report reviews the stages that the company went through from manual operations for bookkeeping, estimating,...
Scenic Squeeze
Constructing a four-lane dual highway through the 12 miles of Colorado's Glenwood Canyon involves several engineering innovations: cantilevered roadways, unusual retaining...
Return to search