Montgomery Point Lock and Dam Entrance to the McClellan-Kerr Arkansas River Navigation System
The McClellan-Kerr Arkansas River Navigation System has experienced a steady and positive increase in use. However, in the last 10 years changing conditions along the Mississippi River...
Instream Habitat Considering Hydro-Peaking
Hydroelectric projects with storage have the characteristic of being able to generate electricity with short notice and to stop generating electricity with equally short notice. This peaking...
Application of the GRASS Geographic Information System in a Sensitive Environment of the Arkansas River Navigation System
A Geographic Information System (GIS) was used to assist the selection of environmentally sensitive dredge material disposal sites along the Arkansas River Navigation System. Maintenance...
Optimization of a Groundwater Well Monitoring Network
An optimization model is presented for the design of a well monitoring network for groundwater quality and quantity parameters. The model utilizes a geostatistical procedure to estimate...
Modeling Volatile Organic Transport with Vapor Sorption
A flexible finite element simulation model is developed to predict the movement of volatile organic compounds in variably saturated subsurface regions. The model incorporates both the...
Groundwater Quality Network Design
This paper presents a methodology that uses optimization for designing a groundwater monitoring network. The methodology incorporates parameter estimation in conjunction with a numerical...
An Economic Evaluation of Property Rights to Groundwater Resources in the State of Texas
The objective of this paper is to evaluate the basis for determination of property rights to groundwater in Texas, and to consider the implications of existing groundwater legislation...
A Comparison of Two Reservoir Projects and Associated Fisheries Impacts
The evaluation of environmental impacts is a critical component of reservoir project development. Impacts to fisheries are especially significant because of the extensive alteration to...
Hueco Bolson Recharge Demonstration Project
The Hueco Bolson Recharge Project in El Paso, Texas, is a unique recharge system, being a full-scale program in operation for 5 years in which municipal sewage is treated to potable quality...
Conjunctive Management of the Edwards Aquifer and Connected Surface Streams in South Central Texas
The Edwards Aquifer is a long, narrow conduit through which water moves underground across parts of South Central Texas. Increased use of water from the Edwards Aquifer has been substantial...
Managing an Interruptible Water Supply
The Lower Colorado River Authority has developed a plan for the management of an interruptible water supply for demands which do not require a firm commitment of specific amounts of water....
Corps of Engineers Drought Contingency Plans in Texas
The Corps of Engineers, Fort Worth District, is currently preparing Drought Contingency Plans (DCP) for the river basins and its projects. These plans will be incorporated into the master...
Benefits from Floodplain Management Activities in Relation to Operating South Holston Dam
Floodplain management activities have primarily been directed toward avoiding floodplain siting where practical; where siting is unavoidable, elevating structures, facilities, or equipment...
Review of the Design, Construction, and Operation of the Lake Carolyn Flood Control Pump Station
A review of the design, construction, and initial operation of the Lake Carolyn Flood Control Pump Station in Irving, Texas is presented. Staged water resource development design concepts...
Government Cooperation in Water Resources Planning and Management
The California State Legislators have shown real concern in trying to do something about the clearly identified water shortage. Many bills and funding programs have been proposed to encourage...
Streamflow Prediction and Allocation Model in Texas
The State of Texas' Water Rights Adjudication Act of 1967 provided for the creation of regional watermasters to divide the water of state streams in accordance with the adjudicated...
Watermaster Administration of Texas State Waters
The State of Texas is developing a watermaster program which will enable the State to administer water right issues on a regional basis. A primary role of a watermaster operation is to...
Water for Texans?Using the Water Development Fund
This paper is presented to provide information on the Texas Water Development Fund. The Fund is available as a source that can provide financial assistance to political subdivisions of...
The Coming Drought: Are You Ready?
Drought planning is necessary for the orderly development of a water supply system. Long range planning, risk analysis, multi-discipline cooperation, and public awareness are critical...
Drought Indication and Response
A study of rainfall and reservoir level data was conducted on the water supply system of South Central Connecticut to investigate the possibility of developing reliable, easy to use drought...
Return to search