Flexibility of Steel Seismic Moment Connections
Relevant Berkeley experimental results are critically evaluated to determine the flexibility of W18 W24 beam joints with and without stiffeners and/or doubler plates. The paper discusses...

Shear Stresses in Composite Masonry Walls
The behavior of composite masonry walls subjected to inplane loads is a subject that has received little attention during the last few years. The small amount of experimental and analytical...

Information Availability
There seems to be a great deal of concern about lack of availability of information concerning the results of failure investigations. In most court cases there is virtually no technical...

Failure Information Needs in Civil Engineering
If we are to learn from failures of engineered facilities, failure information must be in a useful form, and it must reach those who can effect improved practice. This paper discusses,...

The WMATA Resident Engineer?The Team He Leads and His Responsibilities
This paper discusses the role of the Resident Engineer as a key member of any construction team. It uses the organization and functions as practiced at the Washington Metropolitan Area...

The Resident Engineer?A Member of the Construction Team
The paper discusses the prime concern of a resident engineer, namely, seeing to it that the structure built is in accordance with the plans and specifications and that the work is carried...

The Resident Engineer as Construction Team Member
The success of a construction project is affected by the actions of the resident engineer (RE). Good REs don't come off the street; they are developed through training and...

The Role of the V.A. Resident Engineer
The Resident Engineer plays a vital part on the Veterans Administration construction team. He serves as a hub for communications between the various members of the team as well as the...

The Resident Engineer?Staffing the Team
One of the initial actions a Resident Engineer (RE) must grapple with each time he begins a new construction project is how to staff his construction team. The balancing of the type and...

Construction Scheduling for Public Sector Projects
The paper presents some types of scheduling systems that are utilized in Postal Service projects as well as the advantages and disadvantages of each. It is suggested that schedule approval...

Can We Save the Ogallala?
The useful life of the Ogallala Aquifer, which underlies seven western states, can be extended indefinitely through water conservation in the widest sense of the term. In addition to optimization...

Danger: Natural System Modeled by Computer
Computer (mathematical) models are written to simulate such natural systems as those leading to acid rain, flooding, or toxic waste migration from disposal sites into groundwater. In some...

Computer Keeps New Orleans: Head Above Water
The city of New Orleans has been beset with drainage problems since its founding in 1718. A major drainage system was installed in the city in the late 1800s, but it has grown increasingly...

Insulative Lightweight Concrete for Building Walls
Research is currently being conducted to develop a portland cement concrete for use in low-rise building walls that will combine the structural, thermal insulating, and heat storage capacity...

Simulating Construction Operations by Microcomputer
Field operations on major construction projects involve complex interactions among construction equipment, materials and supplies, skilled craft resources, and technical and administrative...

Modeling Construction Companies
This paper reports on the development, implementation, and practical use of a micro-computer based system which simulates the organizational performance of construction companies. The...

Specification Deficiencies?Contract Disputes
The costs of rework, replacement, duplication, delays, and related administration are major factors in disputes. The major reasons for specification-caused disputes are discussed. A three...

Better Design Documents Through Constructibility Review
The Corps of Engineers (Corps) improves the quality of design documents by an extensive program to review in-house and Architect/Engineer (A/E) designs. This review is composed of several...

The Printed Word: A Defense Against Liability?
Design professionals should endeavor not to write burdensome or inaccurate contracts; i. e. , those that inaccurately describe duties. Inspector liability is not relieved by ambiguity...

An Owner's Role in Dispute Avoidance & Resolution
Construction disputes can be avoided in number and severity through education of the project team. This paper will identify a variety of ways an owner can avoid disputes, pinpointing reasons....

 

 

 

 

Return to search