Improving Design of Small Hydro Plants
One objective of this paper is to show why certain features of many small hydro plants have given poor operational performance or experienced expensive maintenance problems. A second objective...

Modern Technology in an Ancient Environment?The Answan II Power Plant
The Aswan II power plant is located at the old Low Aswan Dam in Southern Egypt. This dam was constructed in the early years of the century in order to provide irrigation water for cash...

Managing the Jim Falls Hydro Redevelopment Project
This paper addresses two of the water management issues involved in the design and construction of the Jim Falls Hydro Redevelopment Project. These issues include selecting the optimum...

Rebuild of Ten Mile Intake Flume Structure for Electron Hydropower Project
In 1984 the Puget Sound Power and Light Company began a rebuild of what is popularly referred to as the 'world's crookedest railroad. ' The 'railroad'...

Cedar Falls Project?Major Rehabilitation
This paper presents planning objectives and operational considerations which governed the design and construction of a major rehabilitation project implemented at the City of Seattle's...

Turbine Intake Modification for Fish Passage
This paper describes one solution the U. S. Army Corps of Engineers has found to improve juvenile fish guidance at Bonneville Second Powerhouse on the Columbia River. Juvenile fish passage...

Civil Design of Underground Hydro Power Projects
Various reasons exist for the development of underground schemes. Limited space at dam sites in deep and narrow river valleys makes it favourable to separate the power house from the dam...

Waterstop Technology?The Next Chapter
Water leakage through and around failed waterstops in concrete structures can cause serious flooding, damage to equipment, affect structural stability, and pose potential safety problems....

Rock Engineering at Cat Arm Hydroelectric Development
Cat Arm Hydroelectric Development in Newfoundland, Canada, develops 129 MW from 384 m of head. The project was constructed between 1981 and 1984 and comprises 5 large dams, 5 small dams,...

Isabella Project?Retrofit of Existing Tunnel
This paper explains conceptual methods of reinforcing and lining the section of the existing tunnel downstream of the three control gates to the exit portal and bifurcation for the power...

The Effect of Geology on the Dinkey Creek Project
The proposed Dinkey Creek Project is located about 40 miles northeast of Fresno, California. The project consists of a 360-foot high rockfill dam, two powerhouses, 41,600 feet of power...

Adapting Tunneling to Rocks of the Sierra Nevada
Exploration programs were completed to select the most economical tunnel routes which are not only the shortest but are those which can be excavated by tunnel boring machines with the...

Bath County Tunnel System/Remedial Treatment Program
The Bath County Pumped Storage Project, owned jointly by Virginia Electric and Power Company and Allegheny Generating Company, is located 70 miles (112 km) north of Roanoke, Virginia....

Lake Tap?Crater Lake
The Crater Lake Phase of the Snettisham Hydroelectric Project has been designed and is currently under construction. This paper describes the design and construction of the lake tap which...

Frazil Ice Control Using Electromechanical Cibrators and Ice-Resistant Coatings
Two methods, using electromechanical vibrators and ice-resistant coatings, were studied in a small-scale test conducted at the U. S. Army Cold Regions Research and Engineering Laboratory...

Osoyoos Lake Control Structure
The new Osoyoos Lake Control Structure has been built on the Okanogan River at Oroville, Wa. The site is about 2 miles downstream from the outlet of Osoyoos Lake, and about 9 miles south...

High Pressure Grouting of the Bath County Tunnel System
A major grouting program was completed at the Bath County Pumped Storage Project between March and September 1985. High pressure grouting for seepage reduction was completed in a total...

Research and Development Program on Small Scale and Low Head Hydro by the Canadian Government
In July 1985 the Canadian Department of Energy, Mines and Resources (EMR) was assigned the responsibility for the federal support program for renewable energy R&D in Canada. In...

The Impact of Inlet Flow Characteristics on Low Head Hydro Projects
This paper discusses the intake civil designs, addressing head loss and flow distribution into the turbine intake. The impact of poor flow quality on head losses, turbine performance,...

Analysis of Hydraulic Transients for Design and Operation of Two Powerhouses in Series
The Dinkey Creek Project will be located in the southern Sierra Nevada mountains 40 miles north-east of Fresno, California, and will develop about 4000 ft of gross head with a maximum...

 

 

 

 