Joint Use Right-of-Way Agreements for the Miami Metromover System
This paper presents an overview of the right-of-way acquisition process for the Miami automated people mover system (METROMOVER). The cost associated with the acquisition of the necessary...

Station Design Approach to Peoplemover System
This paper examines some of the real issues that face the planners and designers of tomorrow's urban people movers. Concerns such as the urban context of the Miami METROMOVER,...

Station Design for Vancouver ALRT
An overview of the fifteen stations in the first phase of Vancouver's new automated light rail transit system is provided. Decisions related to station locations and types,...

Downtown People Mover System Security: Detroit and Miami Responses
The Detroit and Miami downtown people mover (DPM) systems will be in uncontrolled environments in major urban central business districts. Both plan not to have personnel on vehicles or...

Human Interface Design of an APM Control Center
The control center of an Automated People Mover (APM) system is a man-machine system. Both software and hardware aspects of the design of the monitor room that directly affect ease of...

An In-Plane Finite Element Model for Brick Masonry
A finite element model for brick masonry is reported. The model takes account of non linear deformations and progressive local failure. The failure may occur in the joints alone or in...

Behavior of Cavity Masonry Walls Under Out-of-Plane Lateral Loading: An Analytical Approach
In this paper, a finite element model is used to analyze cavity walls in an attempt to understand their complex behavior and to evaluate the adequacy of the assumptions embodied in the...

Shear Design of Masonry Walls
The paper presents a summary of a research project carried out at the Swiss Federal Institute of Technology Zurich to develop a design method based on the ultimate strength of masonry...

Wall/Floor-Slab Interaction in Brickwork Structures
The paper summarises the results of three series of tests on sections of brickwork structure carried out with a view to determining the characteristics of wall/floor slab joints in terms...

Shear Stresses in Composite Masonry Walls
The behavior of composite masonry walls subjected to inplane loads is a subject that has received little attention during the last few years. The small amount of experimental and analytical...

Failure Statistics Categorized by Cause and Generic Class
Failures can be classified into the three categories, ie. , SAFETY, FUNCTIONAL, and ANCILLARY. Within the causation definition, failures fall into five general areas: DESIGN DEFICIENCIES;...

Failure Investigation Process
The purpose of this paper is to consider the present failure investigation process, in order to assess whether failures are being properly investigated, and also whether sufficient information...

Alternative Procedures for Investigating Failures
Failures of engineered structures continue to occur. This is despite rapid advances in engineering theory, new, more sophisticated methods of analysis, and streamlined techniques for preparing...

Information Availability
There seems to be a great deal of concern about lack of availability of information concerning the results of failure investigations. In most court cases there is virtually no technical...

Failure Information Needs in Civil Engineering
If we are to learn from failures of engineered facilities, failure information must be in a useful form, and it must reach those who can effect improved practice. This paper discusses,...

Learning from Failures
Modern technology and innovation have created a gap between what the design drawings predict with respect to safety and serviceability of a structure and the real safety and serviceability...

Failure Investigations in Undergraduate Education
Author stresses the need for failure investigations in undergraduate education especially in Civil Engineering. The civil engineer often creates only one major project of a kind, and is...

The Consulting Engineer's Resident Engineer on Public Works Projects
The importance to the owner, engineering firm, and construction contractor of a qualified Resident Engineer on a construction project cannot be overly emphasized. Similarly, the duties,...

Project Coordination Resident Engineering Costs Versus Construction Costs for New York City Department of Environmental Protection
The paper explains how the New York City Department of Environmental Protection has successfully completed a 1 billion construction program using only resident engineer inspection services....

Project Administration
The paper discusses the vital issues involved for the efficient administration of a construction contract: effective communication, field office staffing, long lead procurement of equipment,...

 

 

 

 