Experimental Investigation of the Cross Flow Turbine
A laboratory model of the Cross Flow Turbine was investigated in the Hydraulics laboratory of Colorado State University. Because of the successful use of this turbine in the developing...
An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...
Influence of Surface Finish on Thrust Bearing Life
The original pivoted pad thrust bearing installed and fitted at the Holtwood Power Station in 1912 by A. Kingsbury has been operating continuously since that time without any difficulty....
Accelerated Life Testing of Generator Coils
This paper presents a step-by-step procedure for doing a 400 hour, 60 Hz, 90 degree C accelerated life test on generator coils. Test procedure is as follows: 1. Initial coil examination...
Fretting Corrosion on Large Split Thrust Bearing Runners
In the early fifties interfacial slip was measured on laboratory models. Design improvements, resulting from these tests, were incorporated into later machines. These improvements appreciably...
Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part A: Failure Investigation and Lessons to be Learned
A lightning strike caused electrical failure at Spokane's two Upriver power plants, resulting in the river overtopping Project embankments, and causing nearly 11. 5 million...
Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part B: Rehabilitation and Enhancement of Project Civil and Mechanical Facilities
A feasibility investigation of rehabilitation alternatives was conducted which identified several alternatives for repairing the damage and placing both powerhouses back on-line. These...
No. 1 Water Wheel Project, Gilman, Vermont
This paper describes the replacement of an old generating unit with a new unit in a turn-of-the-century mill building where three other such units were already operating. The key issues...
Hydropower Goes Downtown
Beneath a busy street in Southern California seems an unlikely location for a small hydroelectric generating plant. However, located just below El Segundo Boulevard in the town of El Segundo...
After L'Ambiance Plaza
In the aftermath of the tragic collapse of the L'Ambiance Plaza apartment building at Bridgeport, Conn., in April 1987, reforms are being proposed. In 1987 ASCE approved writing...
The European Underground
Three tunneling projects in Europe are described: a tunnel bored under two rivers in Lyon, France, a subway station constructed as a mined tunnel in Vienna, Austria and a tunnel mined...
Grout Supports Brooklyn Tunneling
At the Red Hook project in Brooklyn, microfine cement grout was injected from the surface to support underground tunneling. The hand-dug tunnel was built to connect to sewer pipes. Subsurface...
Planning, Design and Cost Estimates for RCC Dams
Engineers, planners, and officials of agencies responsible for developing water resource projects are confronted with preparing preliminary designs and cost estimates for dams. This paper...
Behavior of Completed RCC Dams
Enough roller compacted concrete dams have been completed to allow an overall evaluation of this new approach to construction. Performance has been good. No operational restrictions have...
Comparison of Joint Shear Strengths for Conventional and Roller Compacted Concrete
Direct shear test data for parent material and bonded and unbonded jointed specimens of conventional and RCC (roller compacted concrete) are presented and compared. Results are discussed...
Roller Compacted Concrete Mix Design for Pamo Dam
Pamo Dam is designed as a 265 foot (81M) high gravity dam that will be located on the Santa Isabel Creek in San Diego County, California. RCC volume will be approximately 491,000 cubic...
Monksville Dam: Design Evolution and Construction
This paper documents the application of experience gained at other RCC projects to the Monskville Dam. The evolution of the design and its translation to construction are presented together...
Quality of Works in RCC in France: A Contractor's Solution
Bec Freres S. A. , a French dam contractor, introduced the technique of roller compacted concrete (RCC) into France. The first two French RCC dams were built as a result of a program of...
RCC in Dams in Australia
The design, construction and performance of the first three dams constructed in Australia, using RCC are described. Aspects covered in the paper include designing for zero cohesion between...
Saco Dam?South America's First RCC Dam
Because of cost and a lack of suitable embankment materials, Saco Dam at Nova Olinda in Paraiba, Brazil, was redesigned and built with lean roller compacted concrete (RCC). The structure...