Rail Transit Construction Readiness: The Evolving MARTA Organization
A rail transit project is a complex undertaking involving thousands of people, expending millions of dollars and ultimately taking years to accomplish. The Metropolitan Atlanta Rapid Transit...
A Damage Function Using Structural Response Measurements
A new damage function is proposed that expresses seismic damage in terms of the range and number of cycles of plastic deflection experienced by a structure. This and other damage functions...
Concepts and Methods in Reliability-Based Structural Optimization
This paper presents an overview of the major concepts and methods used in reliability-based structural optimization. New formulations related to multicriteria optimization are developed....
Damage Model for Buildings Subjected to Earthquakes
A model based on random vibration method is developed for assessing building damage to earthquakes. The damage of reinforced concrete structures is expressed as a linear combination of...
Probability-Based Load Criteria for Structural Design
Load criteria for use in limit states design of structures are developed using probabilistic methods. Statistical data on load and strengths are integrated by the reliability analysis...
The Role of the Quality Assurance Management on a Large Commercial Project
The role of the quality assurance manager on a high rise project being built on a tight time schedule is a challenging and diversified assignment. It is made especially difficult when...
Construction Management: Dallas North Tollway Project
This article will attempt to illustrate the importance of flexibility of the design and construction inspection process to insure the project is constructed within the time and budget...
International and Educational Aspects of Watershed Management
International donor agencies involved in furnishing technical and economic assistance for increasing food and fiber production are focusing their attention towards rain-fed agricultural...
A Look to the Future in Watershed Management
The discipline of watershed management will continue as a viable specialized field as the scarcity, demand, and price of water increase in the future. Training of watershed managers should...
Tools for Managing Army Training Lands
Army land managers and planners are responsible for managing large, diverse parcels of training land for sustained use. The highly variable but often destructive training requires a systematic...
Acid Deposition in the Wind River Mountains
National attention has been focused on the discovery of acidified lakes in the Adirondack Mountains of New York and elsewhere in New England. It is commonly believed that the West, in...
Closed Negotiations?Out with the Poker Players
The paper describes the closed negotiation process employed by one owner/client, the U. S. Army Corps of Engineers, in procuring firm, fixed price design service contracts. Although not...
Advantages of Standard Contract Forms
The standard forms produced by the Engineer's Joint Contract Documents Committee (EJCDC) offer many advantages to Engineers and others involved in the negotiation and preparation...
Techniques of Negotiation
Three primary qualities are necessary for effective negotiation: knowledge, attitude, and skill. The author's firm has successfully used a negotiating team approach. This...
Embankment Seepage Control Design and Construction
For seepage control features of embankment dams, design criteria and construction practice is reviewed as it is reflected in the experience of the U. S. Army Corps of Engineers. The generally...
Seepage Control at Cochiti Dam, New Mexico
Significant design data, design assumptions and computations, and performance of the seepage control features provided at Cochiti Dam are summarized in this paper. The dam is a rolled...
Soldier Creek Dam Foundation Drainage
A possible mode of failure for Teton Dam, piping of erodible core material through unsealed foundation joints, was also concluded as being possible at Soldier Creek Dam, Utah. Evaluations...
Seepage in the Unsaturated Zone: A Review
This paper briefly reviews the procedures whereby the seepage rate, depth of penetration of nonreactive pollutants, and the depth of the wetting front can be calculated when the assumption...
Containment of Textile Waste Using a Geomembrane
A wastewater treatment plant for a textile mill incorporated two 2. 7 million gallon aeration ponds which had originally been lined with clay. The clay liner leaked and caused the formation...
Seepage Control for Embankment Dams USBR Practice
The current Bureau of Reclamation approach to seepage assessment, analysis, and design for embankment dams is described. The advantages and appropriate applications for the analysis programs...
Return to search