Designing for High Technology Use
Four papers are presented detailing factors and/or case studies on high technology facilities. The authors represent different points of view. An owner discusses the three phases of the...
Quality of Inspectors?In Search of Excellence
Assuring quality in construction has become a major challenge to the design/construction industry today. Attention to the issue has been a result of problems in the nuclear power industry...
Seismic Evaluation of Lifeline Systems?Case Studies
This book contains the papers presented at the technical session titled Seismic Evaluation of Lifeline Systems?Case Studies at the ASCE Fall Convention in Boston, October 27-31, 1986....
Structures Congress '86
Abstracts
Abstract only. Abstract from a collection of papers presented at Structures Congress '86, held in New Orleans, Louisiana, September 15-18, 1986....
How to Use a Transit Consumer Information System
This paper reports the results of an effort to implement a consumer information system in a small urban area. The system was designed to periodically report the travel patterns and viewpoints...
Performance Analyses and Design for Urban Bus Transit
This paper describes a Management approach to Bus Transit Systems based on the treatment of Demand, Supply and Policy. The procedure described is currently supported by a series of interactive...
Saving the Lady
Restoration of the Statue of Liberty is as much an exercise in cooperative management as it is in technical design and execution. Among those sharing management responsibility are: the...
Wharf Stands on Stone Columns
A wharf was constructed in New Orleans on very weak soils. To prevent lateral and vertical movement of the soil, normally the entire wharf and adjacent structure would be founded on steel...
CPM Harnesses Mammoth Powerplant Job
One of the largest air quality control retrofit projects in the U. S. is at the Sammis Plant of Ohio Edison Co., along the Ohio River 40 miles west of Pittsburgh. The coal-fired plant's...
Maintaining Our Goals
Setting goals is easier than achieving them and, once achieved, they must not be viewed as final accomplishments to put behind us - they must be sustained. Although goals are essentially...
Concrete Rehabilitation Options and Solutions
This paper demonstrates the basic steps for a successful rehabilitation program using a case study of the rehabilitation work for the NASA/JPL 64-meter deep space communication antenna....
Rehabilitation of the CNW and ICG Railroads
The railroad industry is an indispensable part of the American economy. However, the railroad infrastructure was allowed to deteriorate to the extent of having 5. 4 billion in deferred...
Earth Retention & Noise Absorption Using Evergreen Planted Walls
There is a new concept in wall design used for retaining walls, free standing noise absorbing walls and rock revetments. The Evergreen System is comprised of large prefabricated concrete...
Tunnel and Bridge Construction with Minimum Disturbance to Overhead Services
The rapid growth of pipe jacking over the last 20 years and the improvement and development of methods in terms of lengths of drive, size and ability to work in varying ground conditions...
Learning From Failure
Innovative engineering design involves assumptions about the future use and behavior of a structure. By understanding and learning from the infrequent but spectacular large failures, engineers...
Design of Strontia Springs Arch Dam
The development of the layout and the history of design of the 292 foot (89 m) high Strontia Springs Dam is presented. While a brief description of the general project layout and foundation...
Geology of the Strontia Springs Arch Dam
Precambrian metamorphic gneisses comprised the foundation rock at Strontia Springs Damsite. Geologic exploration at the axis selected for the arch dam revealed a large shear zone which...
Geotechnical Aspects of Strontia Springs Arch Dam
The bedrock at the Strontia Springs damsite consists of generally excellent quality granitic and metamorphic rock, except for a wide shear zone located beneath the dam in the lower valley...
Hydraulic Design of the Strontia Springs Diversion Dam
The hydraulic features which were of primary significance for the project were the diversion tunnel and spillway. The low-level outlet valves and water-supply intake were relatively straight-forward...
Molikpaq Deployment at Tarsuit P-45
An overview is provided of the engineering considerations and approach to deployment of the Molikpaq. Topics addressed include site investigation, foundation preparation, berm construction,...