Surface Bypass-Collector Concepts and Performance
Surfacetype bypass collectors and concepts are described. Biological and engineering requirements to pass juvenile salmonids at Snake?Columbia River dams are presented. The components,...

Value Engineering Changes to the Eastside Pipeline
Value Engineering is a process of applying analytic, creative and evaluative techniques to a project in order to make recommendations that will, when implemented, maximize value and quality...

The Secondary Inlet of the Eastside Pipeline Project
The subject of this paper is a design feature included in the current capital improvement program of the Metropolitan Water District of Southern California. This feature, the Secondary...

South Carolina Department of Transportation's Statewide Program of Bridge Scour Evaluation
The South Carolina Department of Transportation (SCDOT) has instituted a program to satisfy the FHWAs requirements to evaluate the scour potential of the Nations bridges. The SCDOT's...

Wetland Mitigation Evaluation Ten Years After Florida Keys Bridge Replacement
From 1912 to 1935, the Florida Keys were connected to the mainland by Henry Flagler's Overseas Railroad. The 1935 Labor Day Hurricane destroyed most of the railroad from Plantation...

Dynamic Analysis of Multi-Pool Irrigation Canal
This paper discusses the dynamic characteristics of an open multi-pool irrigation canal from robustness point of view. In particular, the presence of right-half plane zeros in an open...

Grade Control Structures for Pipeline Crossings in the Arid Southwest
Pipeline crossings at streams, rivers, and washes are at risk due to bed and bank erosion in the river environment. Buried pipelines may be exposed in the channel bottom by scour of bed...

Successful Implementation of Grouted Boulder Grade Control Structures on Drainageways in the Denver Metropolitan Area
This paper describes the development of design guidelines for the Grouted Sloping Boulder drop structure as an alternative for the sloping riprap drop structure. A number of partial failures...

Groundwater Remediation Design When Pretty Good is Good Enough
This paper introduces some new approaches toward the optimal design of groundwater remediation systems or any other engineered systems. These new approaches primarily consist of making...

Instrumentation for Field Measurement of Abutment Scour
Prototype scour monitoring instruments were installed on a sloping abutment as part of a research project to develop scour instrumentation. Abutment installations create new and sometimes...

Liability of Engineers When Wetlands Laws Change
Engineers who perform wetlands delineations or design facilities in wetlands areas are increasingly sued in court when wetlands laws or regulations change. Owners and developers whose...

White River Fish Screen Project Planning and Design
In 1983, Puget Sound Power and Light Company (Puget Power) submitted a license application to FERC for the overall White River Project. One of the elements of the project application was...

1995: Where the Past (Paleoflood Hydrology) Meets the Present, Understanding Maximum Flooding
Paleoflood hydrology has become accepted in the scientific, engineering, and regulatory communities and increasingly is being used to complement engineering hydrology throughout the Rocky...

Potential-Scour Assessments at 130 Bridges in Iowa
A total of 130 highway bridges in Iowa were assessed for potential scour using a potential-scour index developed by the U.S. Geological Survey for a bridge-scour study in western Tennessee....

Monitoring Scour at Bridge Piers in Snohomish Co., WA
Washington State, Snohomish County Public Works Department is using a new Fixed Mechanical monitoring device, to augment its current program of monitoring scour at bridge piers. The Public...

Scour Study for Bridge Design on Temecula Creek
Channel-bed scour was studiedfor the proposed new Pala Road Bridge on Temecula Creek in Riverside County, California. In order to determine the general scour, sediment transport and potential...

Salinity and Hydraulic Issues at a Constructed Wetlands
A constructed wetlands at Boulder City, Nevada was designed to use effluent pumped from the City's wastewater treatment plant. The design was complicated by the highly permeable...

Scour in Erodible Rock II: Erosive Power at Bridge Piers
Scour depths around bridge piers founded on erodible rock can be determined by making use of the Erodibility Index Method. This method defmes an erosion threshold by relating the erosive...

Contraction Scour at Bridges Founded on Clay Soils
With the federally mandated bridge scour program deadline of January 1997 approaching, scour evaluations are in full progress in many states around the country. A common physical situation...

Design of Riparian Habitat Replacement in Active Floodplains
Conventional flood control engineering techniques and approaches that have been traditionally been applied are now challenged by the public and no longer readily available as floodplain...

 

 

 

 

Return to search