Emergency Shore Protection
Emergency shore protection usually requires design and construction to be completed in a 2 to 3 week period. Emergency shore protection measures at Surfside and Ventura, California required...

Bulkhead Instability in Soft Soil
This paper presents a case study involving the severe disturbance of the subsurface soils in front of an existing bulkhead caused by the berthing of a jack-up type, offshore drilling vessel....

A Railway Protection?Coastal Structures on Tyrrehenian Calabrian Coastline
The stretch of Calabrian coastline facing the Tyrrehenian Sea has for many years undergone severe erosion, exposing the Battipaglia-Reggio Calabria railtrack to the direct action of waves....

Ocean Erosion Control for the Private Sector
The paper describes some procedures of design and construction of riprap type protective structures to contain ocean erosion and to provide an end product that both gives protection and...

Environmental Mitigation Techniques for Marina Development
The paper discusses a coastal design process entitled 'Design by Mitigation'. It describes a series of mitigation measures and techniques which can be used to...

Wetland Restoration and Port Development: The Batiquitos Lagoon Case
Batiquitos Lagoon in San Diego County, California was once a fully tidal lagoon system. Since American settlement of the area, sediment has filled the lagoon, fills for road crossings...

Innovations in Dredged Material Disposal in Puget Sound
This study, known as the Puget Sound Dredged Disposal Analysis (PSDDA), is building on a strong history of federal/state cooperation within Washington which is unique in the United States....

An Innovative Solution to the Difficult Coastal Zone Management Problem of Dredge Material Disposal
The New York Power Authority is constructing a 300 km predominantly double circuit 345kV transmission facility through southeastern New York State. A key element in this project is the...

Aquatic Dredged Material Disposal in New England
The Disposal Area Monitoring System (DAMOS) is a large multi-disciplinary environmental monitoring program instituted by the New England Division (NED) of the U. S. Army Corps of Engineers...

Protocol for Deep Ocean Disposal Monitoring
Deep ocean sites are presently being considered for the permanent disposal of wastes. The Environmental Protection Agency (EPA), in conjunction with other agencies, is mandated to monitor...

California: Private Beaches Yield to Public Access
California, often a leader in championing public rights, has grappled with the issue of private ownership versus public usage of the seashore, and in recent years has developed interesting...

Judicial Solutions to Beach Access Problems in New Jersey
Legal doctrines notwithstanding, access to public trust beach is still, in many locations, inconvenient, expensive, or impossible. Private property signs containing threats of fines or...

How to Provide Shoreline Public Access
Methods of providing access facilities are covered which range from outright acquisition, obtaining public easements, and converting street ends to conditioning development permits. The...

The Washington State Public Access Program: Finding Solutions to the Shortcomings
This paper discusses the problems of providing adequate public access and focuses on many of the solutions which have been found and implemented in Washington State. In 1983, the Shorelands...

A Design rReview Board's Role in Developing Public Access
In the past 20 years, the Bay Commission, through its permit process, has required that new public access be provided along more than 100 linear miles of the shoreline of San Francisco...

Methods for Developong a Management Plan for a Small Tidal Inlet: Mecox Inlet, Long Island, New York
Few management studies have examined small ephemeral tidal inlets. The magnitude of short-term shoreline changes associated with some ephemeral inlets makes desirable the development of...

Civic Solution: Lake Forest Shoreline Restoration
Recognizing the need to protect its public shoreline against erosion and to restore the area for optimum public recreational use, the City of Lake Forest, Illinois, appointed a 23-member...

Assessment of Beach Nourishment Methodoliogies
Although artificial beach nourishment has become a common practice for mitigating beach erosion in the U. S. , it lacks clear rationales for achieving optimum benefits. Four recent large-volume...

Northwest Regional Coastal Study: An Integrated Approach
The Northwest Regional Coastal Study as proposed consists of: (1) identification of problems; (2) inventory of available information; (3) prioritizing problems and study areas; (4) conducting...

Coastal Zone Management Practices, Northwest Brittany, France
Over the entire coast of Brittany, three government programs have sponsored over 81. 9 million francs (6 ff equals US1, approx. ) of coastal-related programs since 1968. Projects vary...

 

 

 

 

Return to search