Recent Seismic Risk Studies of Nuclear Power Plants: An Overview
Seismic probabilistic risk assessments (PRA) are conducted to estimate the frequencies of occurrence of severe core damage, serious radiological releases, and consequences in terms of...

Comparison of a Practical Fragility Analysis of a Reactor Building with Non-Linear Monte Carlo Simulation
There are several conventional methods to assess seismic safety of nuclear power plants practically. In these methods, non-linear effect of the structural elements is considered with an...

A Plant for All Seasons
Collins, Eckley and Detweiler describe a successful energy conservation program at the Willow Lake Wastewater Treatment Plant, Salem, Ore. By funding the $4.59 million project with a combination...

High Wiring Act
Prendergast describes a project to construct a 345 kV transmission line over 313 mi in southwestern New Mexico, in which, due to environmental considerations and limited access, extensive...

Chicago's Loop: A New Approach
Reconstruction of the Wells St. Viaduct cleaned up a dangerous area just north of Chicago's Loop by providing a structurally sound approach for CTW commuter trains and a column-free...

Tales From Milwaukee's Underground
Written from RETC papers and interviews, this article is a status update on the Milwaukee Metropolitan Sewerage District's $2.1 billion Water Pollution Abatement program,...

A Doubling Design: Rochester's Expanding Airport
Few projects offer greater design challenges or pose more critical construction complexities than a new air passenger terminal, especially when that new terminal must be built on land...

Unlocking Arena Gridlock
The Charlotte Coliseum features a $22 million reversible lane system, which provides easier access to and from 8,000 parking spaces. To improve access to the arena, a 3.6 mi road extension...

HELP is on The Way
Hill and Davies describe current progress on the development of a Heavy Vehicle Electronic License Plate (HELP) system in the United States. The HELP system concept combines automatic...

Small Project Management
Effective management of the small project must guard against overmanagement. Quick, accurate project tracking is required since small projects normally have short schedules, and adjustments...

Monitoring Vibration
Vibration monitoring for construction projects is increasing rapidly. Instrumentation for measuring structural response to blasting began in the mining industry with research by the U.S....

Pilot Bore Pays Off
The primary purpose of tunneling through Cumberland Mountain is to ease the 18,000 vehicle per day traffic through the rugged terrain that was a major transportation route when Daniel...

Recent Advances in Structural Rehabilitation Techniques for Underground Sewer Pipelines
A great challenge for the coming years, if not decades, will be the repair, renovation and renewal of the existing sewerage systems in the Federal Republic of Germany in the interest of...

Case Histories of Sulfide Corrosion
Section 522 of the Water Quality Act of 1987 requires the U.S. Environmental Protection Agency (EPA) to conduct a study of sulfide corrosion and control options in collection and treatment...

Advances in Trenchless Sewer System Reconstruction
The new developments and refinements in trenchless reconstruction technologies now permit total sewer system rebuilding of collectors, interceptors, manholes, service laterals, and force...

Review of PIM (Pipeline Insertion Method) Technology
The U.S. Army Construction Engineering Research Laboratory (USACERL) conducted the first demonstration of PIM (Pipeline Insertion Method, formerly Pipe Insertion Machine) technology for...

Next Stop: The Los Angeles Metro Rail
The Los Angeles Metro Rail is a $6.5 billion light and heavy rail system, which may be entirely completed by the year 2000. A 22 mi segment of the 150 mi light rail system, connecting...

Whatever Happened to Long-Term Bridge Design?
The Chairman of the Board of one of the leading engineering firms in the nation ponders the future of American bridges. In today's designing of bridges, Thomas R. Kuesel points...

Anchorage Sewer Rehabilitation in Campbell Lake
This paper discusses the proposed rehabilitation/replacement of the Campbell Lake portion of the Campbell Creek C-5 Trunk Sewer (C-5 Trunk) located in Anchorage, Alaska. The original corrugated...

Whitfield Reservoir Inlet Outlet Pipeline
Alameda County Water District reports on the planning, design and construction of a 48-inch water main installed under modern urban circumstances. The location of the pipe and the construction...

 

 

 

 