Port of Long Beach Supertanker Terminal
The supertanker marine terminal and crude-oil transfer facility at Berth 121 on Pier E in the Port of Long Beach, California is the largest tanker-handling berth on the West Coast. This...

New Structural Developments for Concrete Marine Structures
New developments in concrete building materials combined with better understanding of the performance of concrete structures is now allowing design and construction of more efficient and...

Perforated Wave Barriers in Small Boat Piers
Perforated breakwaters can be used to reduce the energy and the height of waves entering small boat harbors. By not extending the breakwater to the bottom interference with littoral drift...

Design Concepts for Floating Breakwaters
This paper describes a fundamental approach to the design of a floating breakwater based on the concepts of dynamic analysis of floating bodies. The process results in a relatively simple...

Fisherman's Wharf Breakwater Design and Construction
Fisherman's Wharf Breakwater is a precast prestressed concrete structure presently under construction. It consists of vertical sheet piles braced at the top by batter piles....

Structural Design of Container Cranes
The shipping industry uses container cranes to move cargo containers on and off ships. Container cranes have characteristics common to all crane structures, but many characteristics are...

Innovative Bulkhead Design: Third Port Project?St. Croix, U.S. Virgin Islands
This paper describes an innovative design making use of a 'master pile' bulkhead to support the waterside rail for travelling container cranes as well as to retain...

Berthing Impact Force Distribution on Pile Supported Pier Structures
This paper investigates the degree to which a berthing impact force is distributed to the pile bents of batter pile supported pier structures. A procedure is developed to estimate the...

Geotechnical Aspects of Waterfront Parks: Case Histories
This paper presents several case histories of waterfront developments, and describes the general approach that the geotechnical consultant should take in the design of these projects....

Modern Inspection Techniques n Port Maintenance
This paper addresses inspection of underwater structure of port facilities to acquire information which, when subjected to engineering analysis and confirmation, allows planning of short...

Innovative Repairs to Steel Sheet Pile Structures
Several unique and many unusual repair techniques have been used to structurally rebuild steel sheet pile walls. An example of a unique repair to a cellular cofferdam utilizing a suspended...

Berthing Simulation Method for Fender System
For the design of marine fender systems, berthing and mooring forces should be taken into account. Berthing forces are considered in this paper. A unique berthing simulation method has...

Notes on Geotechnical Input to the Design of Graving Drydocks
These notes discuss geotechnical considerations in the design of graving drydocks, in particular the floors and walls of the structure. The effect of ground-water conditions in the design,...

Terminal 5 Renovation?Port of Seattle
The Port of Seattle is currently renovating its Terminal 5 facility on the west bank of the Duwamish River on the west side of Harbor Island in Seattle. This paper describes the methods...

Geotechnical Considerations in the Design of the Wando Terminal Wharf Extension, Charleston, South Carolina
The South Carolina State Ports Authority (SPA) is currently examining construction concepts for the proposed 1,200-foot wharf extension and 40 acres of adjacent upland development at the...

Rehabilitation of Gravity Wharf by Underpinning
The Municipal Wharf at the Port of Providence, Rhode Island, is currently under rehabilitation to accommodate modern trends in marine cargo handling and shipping. The three-phased project...

Port of Kismayo (Somalia) Rehabilitation
Extensive deterioration of the 2070 ft long four-berth, marginal wharf at the Port of Kismayo necessitated a major rehabilitation to maintain operations. The selected scheme was a steel...

Overdredging at Existing Gravity Structure
Pacific Elevators Ltd. decided to upgrade Berth No. 2 to handle ships up to 70,000 DWT. The difficulty was to maintain the support of the cribs after dredging of the berth to minus 45...

Underwater Compaction of Sand Fill During Placement
A system and related equipment have been developed, and tested on a recent dredged fill project, to compact sand, either clean or with limited silt, in lifts several feet in thickness...

Seismic Design of Earth Retaining Wharf Structures
Seismic design considerations pertinent to earth retaining wharf structures are reviewed. These considerations include: evaluation of the seismic environment and design earthquake ground...

 

 

 

 

Return to search