CBO Says Highway Bill Not Likely to Increase Real Spending

New Law Favors Mediation to Settle Disputes

New York Engineering Firms Optimistic About Business; Hope to Expand Market Share Through Aggressive Marketing

Putting Practitioners on Campus is Aim of New Group

BuRec Report Urges Steps to Mitigate Western Drought

Caltrans Expands Its Research Program—And It Starts to Pay Off

Florida River Project Earns Honor for Civil Engineer

And Then There Were Nine

Technology Transfer, U.S.—Indonesian Style

Claris CAD

Automating Type-Curve Matching

Ground Water in the Pacific Rim Countries
This proceedings, Ground Water in the Pacific Rim Countries, consists of papers presented at the Symposium held in Honolulu, Hawaii, July 23-25,...

Hydraulic Engineering
This proceedings, Hydraulic Engineering, contains papers presented at the National Conference on Hydraulic Engineering, held in Nashville,...

Irrigation and Drainage
This proceedings, Irrigation and Drainage, consists of papers presented at the National Conference on Irrigation and Drainage Engineering held...

Lysimeters for Evapotranspiration and Environmental Measurements
Lysimeters have been used extensively in the past to provide baseline information for development, calibration, and validation of evapotranspiration methods. This proceedings, Lysimeters...

Symposium on Ground Water
This proceedings, Symposium on Ground Water, contains papers presented at the International Symposium on Ground Water in Practice, held in...

Waterpower '91
A New View of Hydro Resources
This proceedings, Waterpower '91: a New View of Hydro Resources, consists of papers presented at WATERPOWER '91 Conference...

Rehab Roundup
The concrete exterior of San Franciso's Coit Tower was damaged and the murals were being destroyed by water infiltrating the structure. Interactive Resources, Inc., Point...

Taller Tunnels
Between 1984 and 1991, Shannon & Wilson, Inc., Seattle, designed renovation programs for more than 25 mi of tunnels for four western railroads. We performed all of this work under...

Avoiding Defective Specifications
Despite everyone's best efforts, the design intent as portrayed in the contract documents is rarely crystal clear. As a result, the owner and the project team often find themselves...

 

 

 

 

Return to search