Exhibits Under Fiberglass
The San Diego Convention Center, scheduled for completion in 1988, is located on 11 acres of downtown land only 150 ft from the bay. It will cost $130 million for total of 1.7 million...

Digestor Do-Over
Digesters at 6 Orange County (Calif.) wastewater treatment plants needed drastic odor control rehabilitation. Repairs included epoxy patching to cracked domes, installation of a geomembrane...

Finite Element Idealization for Linear Elastic, Static, and Dynamic Analysis of Structures in Engineering Practice
This report by the Finite Element Idealization Task Committee is a comprehensive aid for modeling structures for finite element analysis. The first part covers static analysis. Aspects...

Turbine Efficiency Loss Associated with Draft Tube Aeration
Draft tube aeration is one method for improving the dissolved oxygen content of hydroelectric discharges. A simple analytical procedure is presented for estimating the loss in turbine...

Main Canal Headworks Hydroelectric Project
This project is being installed at the Dry Falls Dam, Coulee City, Washington, adjacent to the Main Canal Headworks which controls the irrigation releases to the Columbia Basin Project....

The Paerau Gorge Multipurpose Scheme
The Paerau Gorge Power Scheme is part of a multipurpose scheme supplying irrigation water and electricity to the Central Otago region of the South Island of New Zealand. This paper describes...

Arch Dams for Small Hydroelectric Sites
Approximate formulas are developed for the design of small arch dams. These designs, although conservative, frequently allow for economies over other dam types. Considered are: an approximate...

Changing Stability Criteria: Effect on Older Dams
Many of the dams on the Georgia Power Company system were designed and constructed in the early 1900's. Changes that have occurred in stability criteria since construction...

Dynamic Analysis of Existing Tarbela Intake Towers
According to general practice at the time of the design, the pseudostatic method of applying earthquake loading was used. The basic acceleration was 0. 1g. A post-construction seismological...

Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...

An Overview of Hoover Dam Tunnel Spillway Damage
The Hoover Dam tunnel spillways have provided the Bureau of Reclamation hydraulic laboratories with new and continued opportunities for applied research. During the peak years of the Boulder...

Safety of Dams Activities in the Bureau of Reclamation Lower Colorado Region
In the Lower Colorado Region of the Bureau of Reclamation (BuRec), there are presently eight BuRec dams and one Bureau of Indian Affairs dam being modified or studied for modification...

Application of Computer Aided Design and Analysis Tools for Upgrading Existing Power Plant Equipment
This paper presents examples where state-of-the-art computer aided design and analysis techniques have been applied to upgrade hydraulic performance and structural reliability of existing...

Preventing Fish Mortality at a Large Pumped Storage Plant
A field study program was initiated at the Truman Project to obtain a better understanding of which fish species in the tailrace area would be most susceptible to turbine passage, determine...

Hydro System Enhancement: TVA's Comprehensive Hydropower Program
The Tennessee Valley Authority's Comprehensive Hydropower Program is systematically identifying opportunities for increasing hydroelectric generation in five areas: small...

Seismic Isolation System for a Floating Dry Dock
The seismic isolation system consists of two dolphins, each a relatively large-diameter cantilevered steel pipe pile anchored in Franciscan rock, and buffered connections to the floating...

LRFD Format for Transmission Structures
The structural design of high voltage electric transmission lines in the US is usually governed by the National Electrical Safety Code (NESC). A simple reliability-based Load and Resistance...

Wind Loads on Electrical Transmission Structures
Guidelines for structural loads on electrical transmission structures were prepared by the American Society of Civil Engineers' Committee on Electrical Transmission Structures....

A Field Study of Wind-Induced Conductor Loads
A 161 kV steel pole line in Omaha, Nebraska, is instrumented to provide conductor load field data due to climatic events. Various transducers and monitoring equipment used for data acquisition...

Steel Poles?Past, Present and Future
When using steel pole structures, construction possibilities are limitless. Of all the options available, tubular steel structures provide the most versatility for transmission line construction....

 

 

 

 

Return to search