Holding Up
Now that the redevelopment of the World Trade Center site is under way, the time is right to examine the status of the remaining slurry wall foundation system and consider how future construction...

Assessment of Water Quality Monitoring Sites by an Optimization Method
Allocation of sampling sites is the initial and the most crucial step of the water quality monitoring network design and redesign process. Several different approaches have been used within...

The Water Resources Development Act for Restoration of Urban Waterway Superfund Sites
The objective of this paper is to provide information for interested parties to use in their evaluation of WRDA as a potential authority for completion of sediment remediation and restoration...

Monitored Natural Recovery and Dredging Decision Analysis at Bellingham Bay, Washington
The Whatcom Waterway Site, located within inner Bellingham Bay, Washington consists of intertidal and subtidal aquatic lands within and adjacent to the Whatcom Waterway in Bellingham,...

Sediment Remediation at the Unnamed Tributary to the Ottawa River
A sediment removal action was conducted in the Unnamed Tributary to the Ottawa River to address sediments containing polychlorinated biphenyls(PCBs) at concentrations up to 74,000 mg/kg....

Application of the NRC Framework for Evaluation of Remedial Actions at a PCB Contaminated Sediment Site
The National Research Council recently proposed that the framework of the Presidents/Congressional Commission on Risk Assessment and Risk Management be applied to the selection and implementation...

Transformation
The site of a former wastewater treatment plant in western New York State is now home to a sprawling public works complex thanks to an inventive reuse scheme that consolidates public works...

A Dam for a Dam
The General Electric (GE) Dam in Minneapolis, Minnesota, was more than a century old when it began leaking excessively in December 1998. Operations staff for the dam owner�the Minneapolis-based...

Applications of Multibeam Echo Sounding with Topographic Mapping for Monitoring of Rubble Mound Breakwaters
Analysis of data from the breakwater monitoring program indicates the integration of multibeam survey capability with the increased accuracy of OTF DGPS positioning and advanced data management...

Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...

Calibration of Water-Velocity Meters
The U.S. Geological Survey (USGS), as part of its responsibility to appraise the quantity of water resources in the United States, maintains facilities for the calibration of water-velocity...

National Water Quality Assessment: Moving from Measurement to Understanding
The USGS National Water Quality Assessment (NAWQA) program began in 1991. The objectives of the program were to characterize the quality of the Nations ground and surface water, assess...

A Glass Act
The Museum of Glass under construction in Tacoma, Washington, is the centerpiece of a plan to develop brownfield sites on the Thea Foss Waterway. The $57.3-million museum project includes...

Terminal Island Turnaround
The Pier T marine terminal at the Port of Long Beach is a new 375-acre (152 ha) container terminal being developed at the former Long Beach Naval Station and Naval Shipyard. The $525-million...

Marketing Your Web Site
Most companies in the engineering and construction industry have had their own Web sites for some time. But experts warn that generating traffic from potential clients, job seekers and...

A Constructed Wetland for Wastewater Treatment in the Coachella Valley, Indio, California
The Coachella Valley Wild Bird Center (CVWBC) proposed a wetland habitat site on 22 acres property in India, California, under lease from Valley Sanitary District. The District currently...

Towering Achievement
A new headquarters complex being constructed for Goldman Sachs in New York City will rise where a Colgate factory once stood. The complex will incude a high-rise main building, a mixed-use...

Project Team Leadership
In the research lab, design office, fabricating shop, or on construction site, it is the project manager (PM) who must pull diverse talents and personalities into a project team. Depending...

NAVSTAR Global Positioning System Surveying
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 28. This manual provides technical specifications and...

New Bern Bypass
To alleviate congestion and offer tourists easier access to their destinations, the North Carolina Department of Transportation decided to reroute U.S. Route 17 out of the historic town...

 

 

 

 

Return to search