St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...
Raising the Bar - 345kV Uprating
The paper presents solutions to increasing the transfer capacity (book rating) of two critical 345kV tie lines. Described are computer modeling techniques using laser survey data coupled...
Effect of Aluminum Compression on ACSR Conductor Sags at High Operating Temperatures
Deregulation and restructuring are sweeping the electric utility industry in the United States. As a result, many utility engineers are analyzing, re-rating, and upgrading their most critical...
Multifaceted Trenchless Rehabilitation at the Middletown, Ohio WWTP
This paper describes the multiple trenchless technologies that were evaluated and the ones that were applied to the rehabilitation of a 78la diameter corrugated metal influent line and...
Sedimental Journey
A numerical shoreline evolution model was used to examine the shoreline changes associated with the release of 2.3 million m� of beach-quality sediment from behind Matilija Dam in Ventura...
From Competitors to Partners
Embracing a competitor as a business partner may be somewhat uncomfortable for small engineering firms�at least initially. There is natural concern about what a fellow team member�who...
Shotcrete for Underground Support VIII
This proceedings contains papers presented at the Eighth International Conference on Shotcrete for Underground Support, which took place in Campos do Jord?o, Brazil, in April 1999. It...
The Long Arch
The proposed long-arch method of constructing large underground chambers is a novel variation of well-established cellular construction methods. But each cell is arch-shaped and is independent...
25 Technologies to Watch
While much hype exists over the concept of e-commerce, an expert in design and construction information technologies points out that there are many other technologies in the developmental...
Tunneling with Care
The Mission Valley Light Rail East extension was to run just north of San Diego State University (SDSU), and was to be constructed using a tunnel-boring machine (TBM). But the Metropolitan...
Residential Land Development Practices
A Textbook on Development Land Into Finished Lots
This manual is the first of its type to instruct the reader on residential land development practices. This step-by-step description of the land development process is based on the professional...
Leadership and Management in Engineering
Leadership and Management in Engineering, a publication of the Committee on Professional Practice, examines contemporary issues and principles of leadership and management. The focus is on understanding...
Differing Styles, Personalities and Cultures
It has been my privilege to assist many management groups that are highly multicultural and diverse in their membership. These groups have included minorities, women, and people of all...
Tunneling beneath Cairo
The second phase of the Greater Cairo Metro system in Egypt included many geotechnical challenges. Thirteen kilometers of the 19-km heavy rail line were constructed underground within...
NAVSTAR Global Positioning System Surveying
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 28. This manual provides technical specifications and...
High-Performance Hybrid
The Nebraska Department of Roads is taking advantage of the new high-performance steel (HPS) to develop a modular, two-girder bridge that will employ standardized hybrid HPS components,...
Humboldt Beach and Dune Monitoring
Since 1881, the U.S. Army Corps of Engineers has maintained the entrance channel to Humboldt Bay on the Northern California Coast. This is accomplished through the annual dredging of approximately...
Sinking a Sewer Line
The design and construction of a sanitary sewer siphon using high density polyethylene (HDPE) pipe in San Juan, Puerto Rico, provided Black & Veatch with a challenging opportunity...
Building Code Requirements for Masonry Structures (ACI 530-99/ ASCE 5-99/TMS 402-99), Specification for Masonry Structures (ACI 530.1-99/ ASCE 6-99/TMS 602-99), Commentary on Building Code Requirements for Masonry Structures, Commentary on Specification for Masonry Structures
Building Code Requirements for Masonry Structures (ACI 530-99/ASCE 5-99/TMS 402-99), Specification for Masonry Structures (ACI 530.1-99/ASCE 6-99/TMS 602-99), Commentary on Building Code...
Return to search