Urban Public Transportation System of the Municipality of Beijing and Its Operations and Use by People
The Beijing Municipal Government operates a subway rail system and a surface system of trolleybuses, buses, jitneys and taxis. The Beijing Subway Corporation runs the subway system, and...

Recommended Resources
In the February issue of Civil Engineering (Pages 66-67) we asked owners of small business to tell us their favorite business Web sites. Those...

Sand Rights: A Case Study of the Hamptons' Beaches
The long Federal groins emplaced at Westhampton Beach in the 1960s resulted in accelerated erosion downdrift. The severe nor'easter of December 11-12, 1992 brought the issue to a climax...

Technology in Support of Policy: The Sandag Regional Beach Monitoring Program
This paper describes a regional beach monitoring program conducted in San Diego County, California, by the San Diego Association of Governments (SANDAG). Initiated in 1996, the program...

State and Federal Funding for Beach Restoration Projects
California's beaches are an integral part of its culture and identity. The state's beaches are eroding at an alarming rate. Addressing this concern, CalCoast and CSBPA co-sponsored legislation...

Examining the Capitol Dome
The dome of the United States Capitol, designed and built from the 1850s to the 1860s, is a masterpiece of 19th-century engineering and construction. The majority of the dome is made of...

Verdict Rendered
After the Grays Harbor County Courthouse in Montesano, Washington, was severely damaged by an earthquake in 1999, the surrounding community decided to preserve it. A design/build approach...

Equalizing Wet Weather Flows
Sanitary sewer overflows and combined sewer overflows can wreak havoc on communities by flooding basements, contaminating drinking water sources and recreational water bodies, and flowing...

Banking on Bioengineering
Geoenvironmental engineers have traditionally used riprap to protect streambanks and river banks from erosion. In recent years, however, river regulators, permitting agencies, and county...

Scaling the Monument
One of the three phases in the restoration of the Washington Monument was the design and construction of an aluminum scaffolding system with both functional and aesthetic purposes. The...

Dam Breaching: The Rest of the Story
The U.S. Army Corps of Engineers is evaluating the possibility of breaching four dams on the lower Snake River to improve salmon migration. Because significant infrastructure modifications...

Energy Unleashed
The U.S. Army Corps of Engineers discharges a mean daily flow of 2,000 cu ft/s (57 m�/s) under a gross head of 280 ft (85 m) through four Howell-Bunger valves at the Summersville Dam in...

Sheetflow Water Quality Monitoring Device: Results of Nine Month Field Testing
(No paper) The objective of this 30 month research project was to develop a sheetflow sampler for sampling highway runoff. The specific goals of this Small Business Innovation Research...

Community Participation in the FEMA FIS Process: A New Way to Go
(No paper) As an experienced FEMA Study Contractor (SC), there are numerous items of interest that the community could participate in to facilitate the Flood Insurance Study (FIS) process....

Landing the Big One
The Federal Aviation Administration (FAA) has investigated the potential impacts on airport design of the new large aircraft, which will weigh more than 1 million lbs (453,600 kg) and...

Tall Order
Successive earthquakes have damaged the 32-story, 460 ft (140 m) tall Los Angeles City Hall, built in 1926. Masonry infill and concrete walls have cracked, and the terra cotta cladding...

The Ultimate Challenge
The U.S. Department of Energy (DOE) has spent $2 billion and more than a decade studying the feasibility of constructing a nuclear waste repository inside Yucca Mountain in Nevada. The...

Mental Models and Maps
Each of us has a unique mental model or map of how the particular parts of the world behave or ought to behave. These particular parts might include: the realm of business, the realm of...

A Corps Chief Looks at Rising Tide
A former head of the U.S. Army corps of Engineers reviews a book about the Great Flood of 1927. The book, entitled, Rising Tide: The Great Mississippi Flood of 1927 and How it Changed...

Czech It Out (Available only in Structural Engineering Special Issue)
Bridge and transportation engineers and architects combined on the design of a unique bridge in a small city in the Czech Republic. The cable-stayed bridge only has one tower which is...

 

 

 

 

Return to search