The Lower Mississippi River and the Coriolis Force
Weather patterns and large bodies of water respond to the forces generated by the earth's rotation. A large north-south flowing river, such as the Lower Mississippi River,...

Flushing Flow Analysis Concepts
Many environmentally oriented groups who oppose water resources projects, have conceived various types of flow requirements to supposedly meet a variety of biological purposes in rivers....

Physical Modeling of Major Cutoffs
In 1987, a model study of Lock and Dam No.4 on the Red River in Louisiana required two major cutoffs and a lock and dam to be modeled. Although the Waterways Experiment Station has modeled...

Deposition at a New Dam Near Mount St. Helens
A sediment retention structure (SRS) is being constructed on the North Fork Toutle River in the state of Washington to trap sediments eroding off the 1980 Mount St. Helens debris avalanche....

Elements of a Coastal Stormwater Drainage System
Several elements in the design of a stormwater drainage system that outfalls to the ocean are discussed. The paper discusses a study conducted of the Ocean Lakes Watershed near Myrtle...

International Research on Mechanics of River Bank Erosion?A Summary Overview
A brief overview is presented of research regarding mechanisms of river bank erosion and treatments. In the research river planforms, water stages, currents, waves, ice sediments, bed...

Model for Determining the Optimal Rehabilitation and Replacement of Water Distribution System Pipes
K.E. Lansey and L.W. Mays developed a new methodology for the minimum cost design of new and expansion of existing water distribution systems. This methodology interfaces a nonlinear programming...

The Hydro Business: 1990 and Beyond
During the last ten years, hydroelectric generation received more and more attention as a source of reliable and economical electricity. Since the first WATERPOWER conference, the industry...

Joint Economic Evaluation of Pumped Storage in Colorado
This paper summarizes a joint planning study completed in December 1988 on the economic potential of pumped-storage development. The study was unusual in water development investigations...

Devil Canyon Second Afterbay
This project is located in the City of San Bernardino (Southern California). The addition of a second afterbay for the Devil Canyon Powerplant has been in the planning stages since October,...

IJC Challenges in an Era of Uncertainty
Since its creation pursuant to the 1909 Boundary Waters Treaty between the United States and Canada, the International Joint Commission (IJC) has evolved into an effective mechanism for...

Rule Curve Operation at Terzaghi Dam to Pass the Probable Maximum Flood
Terzaghi dam is located on the Bridge River, a tributary of the Fraser River. The spillway was originally designed for the 1000-year flood. Probable Maximum Flood (PMF) studies completed...

First 10 Years of Operation of The La Grande Hydroelectric Complex
The first turbine of the La Grande hydroelectric Complex (Quebec, Canada) was commissioned in october 1979. Since then, five reservoirs, two rivers diversions, three power stations with...

Sediment Evacuation System for Impounded Rivers
Current solution techniques for the reservoir sedimentation problem are presented and their rationale questioned. The need for focusing on the overall river transport regime is emphasized....

How Many Years to Fill with Sediment, a Sediment Study of Lake Powell on the Colorado River
A study to determine the current capacity and to update information on the life expectancy of Lake Powell was conducted by the Bureau of Reclamation. The study documented the present storage-elevation...

Automation of Existing Dam Control Schemes
For installations that are already in operation, the following advantages are obtained from installing new electronic equipment: In the case that the dam or certain measuring stations...

Management System for Power Plants Tecaid Maintenance System
Operational conditions and production levels are maintained at consistently higher levels when a planned maintenance system is used. Initial operational expenses for a planned maintenance...

Intake Towers and Outlet Tunnels Adapted for Hydro
An intensive design project was undertaken with the objective of retrofitting two U.S. Army Corps of Engineers (COE) dam sites for hydroelectric power generation. The challenge of designing...

Design and Construction of the Moose River Hydroelectric Project
The project's main features are: a 7 ft high, 240 ft long cast-in-place concrete overflow weir; bell mouth entrance concrete intake structure with trashrack and trashrake;...

Cofferdams: An Integral Part of Small Hydro Design
Cofferdam construction costs can be a major factor in the viability of a small hydro development. For this reason, cost-effective design and construction are critical. A cost-effective...

 

 

 

 

Return to search