Arctic Drilling and Production Platform Concept
An 80-well Arctic drilling and production platform for water depths to 100 feet in the Beaufort Sea transition ice zone is presented. It includes a novel inner caisson to help resist large...

Concrete Space Frame Applied to an Arctic M.O.D.U.
The BOUYGUES experience in the use of concrete space frame technology for civil works and the application of this technique, combined with high strength concrete and prefabrication, to...

A Hybrid Structural Ice Defense Mechanism
A hybrid plate composed of steel outer surfaces and a concrete core has characteristics that make it desirable for use on offshore structures in ice prone environments. The service and...

Jumbo Modules for Artificial Islands
The development of the Arctic Offshore oil fields has led to the consideration of gravel islands or other structures to support oil production facilities. The island and the assembly site...

Ice Forces on Port Structures Resulting from Moving Ships
Results are described of experiments carried out in Thunder Bay Harbour in March, 1984, to measure ice forces on a port structure. Ice forces were measured by installing five pressure...

Arctic Offshore Engineering: A New Graduate Course at Texas A&M University
Based upon the present projections for the offshore petroleum industry, many of our future engineering graduates will find employment related to Arctic Offshore activities. In an effort...

Cost-Effective Arctic Concrete Structures
The economic development of offshore Arctic petroleum fields dictates that Arctic structures be both cost-effective and deliverable with minimum lead time. Concrete structures are typically...

Coastal Erosion's Impact on California Offshore Oil Development
Recent oil discoveries in the offshore Santa Maria Basin and the Santa Barbara Channel will require the construction of new oil facilities located along 90 miles of Santa Barbara County...

Earth Pressure on Underground Concrete Pipe in a Field Test
The cause of cracking at the sheetpile extraction in concrete pipes buried by the open excavation method was investigated by loading tests on the pipe and a field test carried out by Osaka...

Dam Pioneers Concrete Variant
The Willow Creek Dam in Oregon is the nation's first dam made entirely of roller compacted concrete. The design and construction of this dam are described and special problems...

Mini Hydro at Low Cost
The Kingsley Dam is an existing irrigation dam that has been retrofitted with electric generating capacity. The project was completed 6 months ahead of schedule without interrupting irrigation...

Retrofit Services: Responding to Today's Market
As a result of the decline in demand for new nuclear power plant construction the nuclear industry has experienced a major change in the nature of business opportunities. To meet the rising...

Structural Considerations for a Radwaste Facility
The structural engineer needs to consider several criteria when designing a radioactive-waste processing facility in order to properly balance the requirements of safety and economy. This...

Look Back and Learn
The cancellations of some nuclear power plants are being attributed in part to cost overruns due to construction-related problems. The experienced civil construction engineer involved...

Decentralization of Nuclear Power Plant Engineering
The cost of nuclear power construction in the past two decades has increased by an order of magnitude, forcing utilities and A/E's to look for ways to reduce engineering and...

Seismic Pope Support Construction Practices
During the mid 1970's the regulatory agencies controlling the design and construction of nuclear power plants began to demand stricter adherence to already existing codes...

Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...

The Prudency Management Audit: A New Challenge for the Civil Engineer
The Nuclear Industry, particularly utilities and their constructor, engineering and vendor agents, is faced with a surging increase in Prudency Management Audits. Such Audits are often...

Nuclear Outages: An Approach to Project Controls
The nuclear refueling outage is short-lived, fast paced, and very costly to the nuclear utility. To better control modification expenses and reduce outage-related costs, utilities are...

Civil Engineering Challenge with Nuclear Waste
The planning, design and construction of the ground surface facilities for a nuclear waste repository involves civil engineering in many ways. The transportation of heavy, metal shielded...

 

 

 

 