Sanata Ana River Project Environmental Compliance with the National Environmental Policy Act (NEPA)
The National Environmental Policy Act(NEPA) was first enacted in. 1969, and became effective as of January 1, 1970. The law was intended to ensure that balanced decision-making occurs...
Local Sponsorship and Floodplain Management
An outline of Local sponsor for SARP and FEMA floodplain revisions....
Cooperative Approaches in Achieving Additional Water Conservation at Prado Dam
The Orange County Water District (OCWD) has successfully negotiated multi party agreements that provide for the use of Prado Basin for water conservation while ensuring protection of the...
Design and Implementation of On-Farm Surface Drainage Projects in the Humid Tropics of Mexico
In the humid tropics of southeastern Mexico, the Mexican National Water Commission (CNA) has constructed a network of collector drains for stormwater runoff removal. At the same time the...
Ecological and Biological Considerations in River Restoration
When planning river restoration projects, proper consideration must be given to the target resources of concern. This should include provisions to meet the physical, hydraulic, and biological...
Role of Vegetation in Hydraulics of Channel Restoration
Boundary layer theory is used to develop a backwater model for flows through vegetated waterways which can be employed to approximately estimate flow depth variation in channel restoration...
Anaheim State-of-the-Art Water Treatment Plant?Six Years from Conception to Completion
After six years of intensive planning, budgeting, pilot testing, design, and construction, the City of Anaheim, California, has successfully completed the modifications to the 15 mgd Lenain...
ASR Case Study?City of Salem, Oregon
The City of Salem, Oregon is developing an Aquifer Storage and Recovery (ASR) system to provide a 20 mgd capacity, 440 mg volume, emergency storage and peak day supplementary supply. When...
Education and Research Needs for Appropriate Technology
Appropriate technology and sustainable development are inextricably interrelated and the engineering profession is increasingly realizing that greater care must be given to taking these...
Economic Risk Analysis as a Research Directing Paradigm
Risk analysis could be used to direct a manageable, prioritized strategic plan for evaluating bridge scour research needs. Through risk analysis, the costs of research and the potential...
San Diego County Water Authority's Emergency Storage Project: A Major Planning Achievement
The San Diego County Water Authority (Authority) has been actively working to maximize the security of the future water needs of the community it serves. The Emergency Storage Project...
Selection of Sediment Transport Relations: Part I, Review of Sediment Transport Comparisons
There are a great number of sediment transport relations in existence in the world today. The engineer is often faced with the problem of choosing the most appropriate relation for the...
Construction of Performance Contours on the Storage-Yield Plane of a Within-Year Reservoir System
The reservoir storage-reliability-yield (S-R-Y) relationships developed in the past have considered only the probability of failure to meet the target requirements, but not the likely...
Protection against Flooding: A New Delta Plan in the Netherlands
The Netherlands are situated on the delta of three of Europe's main rivers: the Rhine, the Meuse, and the Scheldt. As a result, the country has been able to develop into an important industrial...
Implementing a Successful Conjunctive Use Program
Over the past decade, water planners have come to the agreement that conjunctive use is a good strategy to help meet present and ftiture water needs. Storing water underground has many...
Controlling the Impacts of Development on Storm Water Quality through Proper Site Planning and Design
Land development and construction activities can significantly alter drainage patterns, increase runoff peak flow and volume, and contribute pollutants to storm water runoff. Federal and...
Use of Geomorphic Data for Assessing Stream Stability at Bridge Structures
The authors recently completed a statewide bridge scour evaluation for the Nevada Department of Transportation, which included evaluation of the geomorphic processes of bank erosion and...
Water Quality Enhancement Using Subsurface Detention
While underground detention systems have gained wide acceptance in the quantitative treatment of stormwater runoff, the potential exists for substantial water quality improvement. Although...
Use of the Metric System in Water Resources
ASCE has advocated use of the metric system since 1876, and the Board of Direction's policy statement specifically urges use of SI in all civil engineering activities. In...
Resettlement of the Three Gorges Project in China
The Three Gorges Project (TGP), the biggest one in China, is now formally under construction, whose resettlement attracts world-wide attention. Thus introduced in this paper are resettlement...
Return to search