Closed Conduit Vapor Lock
Closed conduit vapor lock can occur when a cross country liquid pipeline is displaced with a gas and the gas is allowed to get ahead of the liquid/gas interface. A simple hydraulic model...

Water Distribution System Design Considering Component Failure During Static Conditions
A continuous hydraulic availability relationship is presented which more realistically models minimum pressure requirements for water distribution systems. This relationship is used in...

Challenging Site Conditions Lead to Unusual and Innovative Powerhouse Design Features
Pacific Gas & Electric Company's recently completed Newcastle Powerhouse is located on the shore of Folsom Lake near Auburn, California. The $26 million facility uses...

Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Excessive vibration amplitudes were experienced in the vertical gated tubular units at the Great Falls Hydroelectric Project located in the City of Paterson, New Jersey. Vibration amplitude...

Predicted and Observed Axial Behavior of Piles
Results of a Pile Prediction Symposium
This publication presents the results of a pile capacity event that was held at the Lakefill site on the Evanston Campus of Northwestern University in conjunction with the 1989 Foundation...

SPIDA Method for Reinforced Concrete Pipe Design
The required supporting strength of buried pipe is affected by the total load that is imposed upon the pipe and the manner in which the pipe is supported by the surrounding soil. The installation...

Creative Application of Materials Engineering
Society's demand for an aesthetically pleasing and safe constructed environment, along with the construction industry's higher and higher costs, dictate that...

Stabilizing a `Mann'-Sized Sinkhole
On Sept. 21, 1988, a sinkhole suddenly developed beneath a transmission/distribution effluent pipeline on Mann Road in Orange County, FL. Initially it measured 30 ft in diameter and 8...

Optimal Design of Small-Scale Hydro Projects
A nonlinear programming model is developed in this study to determine optimal pipe size, the type and number of turbines and the installed capacity for small scale hydro projects. The...

Appropriate Design and Construction of Conduits for Small and Mini Hydropower
The success of smaller hydro schemes often lies in identifying feasible and economic waterway systems to develop relatively high heads between low intake weir and powerstation. This paper...

Waterstop Technology?The Next Chapter
Water leakage through and around failed waterstops in concrete structures can cause serious flooding, damage to equipment, affect structural stability, and pose potential safety problems....

Isabella Project?Retrofit of Existing Tunnel
This paper explains conceptual methods of reinforcing and lining the section of the existing tunnel downstream of the three control gates to the exit portal and bifurcation for the power...

Grout Supports Brooklyn Tunneling
At the Red Hook project in Brooklyn, microfine cement grout was injected from the surface to support underground tunneling. The hand-dug tunnel was built to connect to sewer pipes. Subsurface...

A Station With a View
The Port Authority TransHudson Corp. (PATH) is renovating and expanding Exchange Place station, the first stop in New Jersey across the Hudson River from lower Manhattan. To be completed...

Design of Seepage Control Systems for RCC Dams
As the reservoirs of the first generation of roller compacted concrete (RCC) dams have been filled, several have exhibited significant amounts of seepage, a fact that has been of concern...

The MPSP System: A New Method of Grouting Difficult Rock Formations
In unstable rock masses the traditional stage grouting methods may prove impractical or ineffective. A recent innovation has been the Multiple Packer Sleeved Pipe (MPSP) System. Akin to...

System Reliability Using Expert Opinion
The objective of the study on which this paper is based was to determine the safe performance of several different interior gas piping systems. This paper describes the piping systems...

Water Distribution Network Calibration Considering Multiple Loading Conditions
Through time a water distribution network's carrying capacity is reduced as material collects on pipe walls. The impact varies with each pipe in the system and occurs at an...

Lead: Taking it from the Tap
Medical evidence is lowering the definition of a safe concentration of lead. In turn, there has been an effort to reduce lead in drinking water. Solutions are complicated, as many lead...

Steel Pipe Foundations for Deep Water
Four innovations are helping to make steel pipe piles more popular for foundations in deep water in Southeast Asia. Until recently steel was usually rejected for these applications, because...

 

 

 

 