Thrust Restraint of Buried Ductile Iron Pipe
It is the intent of this paper to present current state of the art thrust restraint design, present a basis for calculating required lengths of restraint, and to offer some practical suggestions...

The Applicability of U.K. Sewerage Rehabilitation Techniques to the U.S.
The total length of public sewers in the UK is 160, 000 miles and in recent years there has been increasing concern over their conditions. Research spearheaded by the Water Research Centre...

Water Main Condition Monitoring A Case Study
Water main breaks, routine occurrences for water utilities, reflect the structural failure of the main. The trend in break patterns is increasing for many utilities in the U. S. Several...

Pipe Geometry and Pipeline Bridge Wind Oscillation
Static and modal analyses of two pipeline suspension bridges owned by American Natural Resources - the Patterson Loop Aerial Crossing (PLAC) with a span of 850 feet (259 meters) and the...

An Investigation of the Supports of a Water Main
Two 48 inch (1. 22 m) diameter cast iron pipes constructed 50 to 70 years ago form a major part of the potable water transmission system of Atlantic City. For the most part of their length,...

Underground Storage Tank Program and Its Implications
National concern over leaking underground tanks storing hazardous materials and wastes has resulted in the implementation of the 1984 Amendments of RCRA, which include the requirement...

Buried Pipeline Research Needs
A workshop was convened with representatives from universities, consulting engineering and research organizations, pipe and/or equipment manufacturers, constructors, users, and government...

Effects of Ground Failure on Ductile Iron Pipe
The design studies and procedures outlined in this paper for pipelines that must cross earthquake fault zones are also applicable to similar ground disturbances resulting from landslides,...

Design/Construct Contract Speeds Bridge Job
In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask...

Japan Tunnels under the Ocean
The 54 km Seikan Tunnel, the longest undersea railroad in the world, opened in March. The tunnel, which connects Japan's two largest islands, Hakkaido and Honshu, is part...

Quality: Out of the Manual and Into the Field
The intent of ASCE's Manual of Professional Practice for Quality in the Constructed Product, Preliminary Edition for Trial Use and Comment...

The Cause of the Johnstown Flood
The Johnstown flood occurred in 1889, when an earth and rock dam failed during a record rainfall in eastern Pennsylvania. The flood was one of the worst civil disasters in the U.S.; 2,200...

The Heavy Duty Geogrid Wall
The geogrid reinforced soil retaining wall was a key component in reconstructing a small hydroelectric plant situated at the center of Cascade Dam in Michigan. It was necessary that the...

Microcomputer Knowledge-Based Expert Systems in Civil Engineering
This book contains sixteen papers presenting applications of expert system technology to civil engineering problems with emphasis on microcomputer implementations. It is divided into four...

Cable Stayed Bridges
Two of these five papers on cable-stayed bridges deal with wind analysis. One develops the theory for motion due to flutter and reaches the conclusion that the vibrations are, in general,...

Mine Induced Subsidence
Effects on Engineered Structures
The influence of mine subsidence on engineered structures is a growing concern of the United States coal industry. This book contains a collection of case histories of the control and...

Parallel and Distributed Processing in Structural Engineering
Parallel processing is emerging as an effective approach to large scale structural engineering computations. The papers included in this book cover vibration analysis using a parallel...

A Summary Description of Design Criteria, Codes, Standards, and Regulatory Provisions Typically Used for the Civil and Structural Design of Nuclear Fuel Cycle Facilities
A summary of design criteria, codes, standards, and regulatory provisions applicable to the civil and structural design of the eight principal facilities of the nuclear fuel cycle are...

Proposed Improvements in Lateral Canal Operations
Uniform and flexible supplies of irrigation water are required for farmers to make the best use of their on-farm application systems. Results of a study of deliveries at the lateral canal...

Random Characteristics of Sediment-Laden Flows and the Techniques of Effective Sediment Exclusion on Dujiangyan Irrigation Project in China
The irrigation system is over 2,200 years old and discharges water at a rate of 340-740 m3/s from the Minjiang River. The average slope of the river...

 

 

 

 