Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines. The plant has been in commercial operation since January, 1969. The runners have a long...

Coordinating Engineering and Environmental Activities in Hydropower Development
This paper reviews the role of hydropower project personnel, particularly the interaction between project management, engineering, and environmental sciences staff in project planning...

Simulation of the Pit 3, 4 and 5 Hydroelectric Project Using the USFWS Instream Temperature Model
The Pit River in Shasta County, California, is the site of the Pit 3, 4, and 5 Project (Project). A two-year Bald Eagle and Fish Study was initiated in March 1983. As part of the overall...

Hydropower Contract Conditions for Civil Engineering Works
Norwegian types of contract documents for hydropower construction work - especially the underground parts - have long had the reputation of being flexible as opposed to the traditionally...

Capacity Planning of Decentralized Small-Scale Hydro Power Plants
Some simple and efficient models are proposed to determine the optimal capacity and the expected energy generation of a decentralized small-scale hydro plant. Both the supply of an isolated...

Hourly Scheduling Model for Multi-Unit Hydro Facilities
A computer model for determining hourly releases and generation for multi-unit hydropower facilities is described. The purpose of the model is to disaggregate daily release volumes (either...

Impacts of Indexed Sequential Hydrological Modeling on Hydrogeneration Capacity Estimation
Indexed sequential modeling (ISM) has been proposed by the Western Area Power Administration as an alternative approach to developing firm marketable capacity (i. e. , project dependable...

Planning of Hydropower Development in Hydrothermal Systems by Capex
This paper discusses the power generation expansion model CAPEX in which provisions are made that specifically account for the distinct characteristics of hydropower. The model determines...

Modeling a Real-Time Reservoir Operation for Hydropower Resources Analysis
This paper deals with modeling the operation of two reservoirs in tandem in order to determine energy gain at the downstream plant due to the regulation provided by the upstream reservoir....

The Benefit/Cost Ratio of a Physical Model Study
The discussions of a physical model study often appear first in the Federal Energy Regulatory Commission ('FERC') consultation process and when appearing later...

Computer Modeling for a Power Intake
This paper describes the application of an existing computer model to respond to environmental requirements for a small scale hydroelectric power plant being developed by Allegheny Electric...

Computer Modeling and Applications
A series of programs is available to evaluate the hydrology, compute the capacity to generate energy, establish unit costs, analyze penstock surge pressures, and simulate ramping rates....

A Laboratory Study of Factors Affecting Wetted Snow Roads
A brief review of the the literature concerning the application of water to the surface of snow roads is presented. It is demonstrated that there is no general agreement on the proper...

The CBR Test Applied to Processed and Compacted Snow
The processes used during the past two decades to improve the snow bear a modest resemblance to conventional flexible pavement construction, thus the field CBR (California Bearing Ratio)...

Design Evaluations in Support of Offshore Facilities and Gravel Islands in the Arctic
Development of oil resources in Northern Alaska has involved the design of nearshore and offshore facilities and structures in the Beaufort Sea and Prudhoe Bay in water depths ranging...

Alyeska Reroutes Trans-Alaska Pipeline at MP 200
This paper discusses the 1985 wintertime repair/reroute to the Trans Alaska Pipeline System (TAPS). The rerouted pipe was approximately 4000 feet long and cost approximately 27 million....

Performance Study of the Lagoon at Inuvik, N.W.T.
Since 1957, Inuvik's sewage has been discharged into a lagoon situated northwest of the townsite. In 1982 the lagoon was upgraded to a two-stage system. Two primary cells...

The Effect of Water Supply and Sanitation Systems on Disease Patterns on Manitoba Indian Reserves
This study examines the links between water supply and sanitation and health on Indian reserves in Manitoba. Health data on water related diseases were obtained from health care agencies....

Coal Mining in Alaska's Interior: Problems and Solutions
The Usibelli Coal Mine located in Healy, Alaska is currently the largest operating coal mine in the state of Alaska. The mine has recently increased production to nearly 1. 7 million tons...

Legal Concerns in Cold Regions Engineering and Construction
For a variety of reasons the potential for the imposition of liability and the potential for comparatively large damage claims is greater in cold regions. It is the purpose of this paper...

 

 

 

 

Return to search