Design of Impact Limiters for Waste Fuel Shipping Casks
Impact limiters are often used to control the decelerations experienced by a waste fuel shipping cask when it is subjected to the hypothetical accident condition loadings. Simplified design...

Simulation of Salt Behavior Using In Situ Response
This paper presents an improved method for simulating the salt behavior. In this method, the governing equations are normalized to the creep function, which represents the transient and...

The Origin, Training, Evaluation and Status of Construction Inspectors
Inspection of construction is mandated by law. Design engineers cannot disclaim their responsibility for construction inspection by citing self-serving language in the contract documents....

Excellence in Inspection
Excellence in inspection starts with proper interpretation of specifications and drawings. There exists a void between the design team and the field people which must be bridged in order...

Quality in the CM Constructed Project
The services of the testing laboratory on construction projects have not generally been considered as part of the construction management function. If the intention of construction management...

CM Certification and Registration
As currently practiced, the construction management system involves a team of the owner, design professional, and construction manager. The peer relationship to team members, nature of...

A Review of Current Contract Documents
Three separate industry groups have published contract documents to be used with the construction management project delivery system. The documents parallel each other in certain respects,...

Requirements of a High Technology Owner
The requirements of a high technology owner are best represented by a set of expectations and goals that are needed to achieve a certain business plan. There are extreme time pressures...

Structural Engineering for High Technology Clients
The unique requirements of the high tech industry provide interesting and fascinating challenges to the structural engineer of the 1980's. The following is a list of the most...

Design of High-Technology Facilities from the Vibration Standpoint
High-technology facilities, such as those used for the production of integrated circuits or for optics research, generally require extremely limited vibration environments. Suitable precautions...

Rehabbing Research
Because a growing share of Corps of Engineers' effort is going int rehabilitation, likewise a growing share of its research is too. This shift in emphasis is encouraged by...

Continuous Loading Consolidation Testing Using a Microcomputer for Control and Data Acquisition
An overview of some of the methods of one-dimensional consolidation testing currently in use is presented, including the load-increment test, the constant rate of strain test, the constant...

Static and Dynamic Analysis of Highrise Buildings on Microcomputers
The author's experience in conducting static and dynamic analyses of three-dimensional multistory buildings on microcomputers using the tier building model and the method...

Graphics Based Preliminary Structural Design
During preliminary design, alternative structural configurations are explored and one or more alternatives are selected for further consideration. During analysis, a structural configuration...

Microcomputers in Construction Education
This paper presents a number of special applications programs developed by Clemson University civil engineering graduate students. The programs are currently being used in both undergraduate...

Computer Systems for Construction Materials Management
Materials management computer systems store, sort, combine and print data files pertaining to materials requisitions, purchase orders, vendor evaluations, and warehouse inventories. The...

Subdivider: Advanced Subdivision Design with the IBM-PC
SUBDIVIDER is an IBM-PC program which aids engineers in the process of dividing tracts of land into lots, streets, and building floor plans. It can be used for the design of traditional...

Knowledge Bases for Multistory Concrete Buildings
Heuristics are used in the concrete building industry. A knowledge base is developed with heuristics used in the selection of the floor framing system of a concrete building....

Advanced Microcomputer Simulation for Construction Managers
The concept of simulation allows the analysis of complex and dynamic systems such as those encountered in construction operations. In particular, the technology orientation of construction...

Microcomputer Expert Systems for Welded Construction
Stone & Webster Engineering Corporation has developed expert systems including various applications within the field of welded construction. Systems have been developed in the...

 

 

 

 

Return to search