Determination of Cost Effective Waste Management System Receipt Rates
A comprehensive logistics and cost analysis has been carried out to determine if there are potential benefits to the high-level waste management system for receipt rates other than the...

Conclusions from Project-90 With Regard to a Regulatory Framework
A five year performance assessment program, Project-90 [1], has been concluded by the Swedish Nuclear Power Inspectorate, SKI. The project was defined to develop independent assessment...

Application of TQM to the Waste Management QA Regulatory Arena
Over the past several years, a number of the scientists involved with the high-level radioactive waste repository project have expressed concern regarding the application of quality assurance...

The Licensing Support System (LSS): Who Should Operate it and Will it Work?
The development of the mammoth Licensing Support System (LSS), a management information system intended to handle documentation relevant to the licensing application of the DOE for the...

The Licensing Support System: Institutional Challenges and Opportunities
The Licensing Support System (LSS) is an electronic information management system which will be used in the Nuclear Regulatory Commission's (NRC) review of the Department...

Regulatory Systems-Based Licensing Guidance Documentation
The U.S. Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations...

Drafting of an ISO Standard for Leakage Tests on Packaging for the Transport of Radioactive Material
A working group (TC85/SC5/WG 10) has been formed by ISO for the drafting of an international standard covering the leak testing of radioactive material transport containers. A certain...

The Last Twelve Months at Yucca Mountain
The U.S. Department of Energy (DOE) is evaluating Yucca Mountain in Nevada to determine if the site would be a safe location for a high-level radioactive waste repository. As mandated...

Perils of Project Development on Public Land Open to Mining
Conducting a government project on public land open to the general mining laws can result in added costs, legal entanglements, schedule uncertainties, and the potential for unanticipated...

Being Responsive and Getting the Job Done Right
The United States Department of Energy (DOE) Yucca Mountain Site Characterization Project Office (YMSCPO) has been given the responsibility for characterization of the potential repository...

Seeking Common Ground: Western Governors and the WIPP Transport Campaign
Nine Western States have engaged the U.S. Department of Energy (USDOE) to prepare for shipments of nuclear weapons waste. These are shipments of transuranic (TRU) wastes from nuclear weapons...

Management of Comments on DOE's Site Characterization Plan (SCP) and Integration with the Planned Geotechnical Program
The U.S. Department of Energy (DOE) has committed to respond to comments on the SCP throughout the site characterization process. As of January 1990 DOE has received 4,574 comments on...

Case Studies in Cooperation with External Groups
Public confidence in the safety of the high-level radioactive waste program can be improved by meaningful participation in the decisionmaking process. Public involvement and the resultant...

An Integrated Systems Approach to Institutional/Technical Program Milestone Planning and Implementation in the Civilian Radioactive Waste Management Program
A broad spectrum of public and private sector institutions in the United States has concerns about the high-level radioactive waste management program. An integrated systems approach is...

OCRWM'S Evolving Strategic Planning Process and the 1990 Plan
In 1990, the Secretary of Energy (Secretary Watkins) ordered that all 23 of the Department's major organizations adopt systems of strategic planning. This paper explains the...

Looking Out for the Ratepayer
The national high level nuclear waste management program has reached a crisis. The Department of Energy is ready to proceed with underground testing, but they are prevented from doing...

Yucca Mountain Near Field Environment Considerations for Engineered Barrier System Design and Performance
Waste emplacement environment will be essentially dry for at least 300 years and will likely continue to be dry for more than 1000 years, both as a result of the unsaturated ambient conditions...

Effect of Ionizing Radiation on the Waste Package Environment
The radiolytic production of nitrogen oxides, nitrogen acids and ammonia are discussed in relation to the expected environment in a high-level waste repository that may be constructed...

Archaeological Program for the Yucca Mountain Site
Archaeological surveys, limited surface collections and selected test excavations in the Yucca Mountain Project Area have revealed four distinct aboriginal hunting and gathering adaptive...

Site and Facility Waste Transportation Services Planning Documents
The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities....

 

 

 

 

Return to search