Habitat Development Using Dredged Material
Over the past eleven years, a number of environmentally and economically acceptable beneficial uses have been tested and developed using dredged material substrates. This work has primarily...

Case History: North Slope Alaska Hydraulic Dredging
Alaska's North Slope Borough, with the aid of dredging machinery consultant Michael Weston, and geotechnical consultant Rittenhouse-Zeman & Associates, has pioneered...

Construction of Monroe Harbor Confined Disposal Facility
Management of the construction of a 40 million project, a confined disposal facility for dredge spoil, within a small multipurpose recreation facility presents unique challenges to intergovernmental...

Design of Confined Disposal Areas for Retention of Contaminants
Dredged material which is unsuitable for disposal in open water due to the presence of contaminants is normally placed in confined disposal areas. The quality of effluent discharged from...

Long-Term Management of Confined Disposal Areas
Systematic management of confined dredged material disposal sites is becoming increasingly necessary as competition for land use intensifies in regions in which most dredging projects...

Impact and Mitigation: LA/LB Landfill Plan
Mitigation planning in U. S. ports has primarily been on a project by project basis, an approach that is costly and ineffective. This paper reports on a biological impact assessment and...

Upland Disposal of Dredged Material at Liberty State Park
The development of a State Park along the waterfront of Jersey City, New Jersey, immediately to the west of the Statue of Liberty National Monument, required the reshaping of the existing...

Alaskan Harbor Plan Features to Reduce Dredging Costs
The high cost of construction and maintenance of harbors in remote rural areas of Alaska has provided unique challenges to coastal engineers and harbor planners in designing affordable...

Fundamentals of Capping Contaminated Dredged Material
Contaminated dredged material disposed in subaqueous sites may be chemically and biologically isolated by covering or capping with a layer of clean material. The capping concept is simple;...

Alternative Upland Disposal Techniques for Dredged Material in Urban Areas
The project involves the dredging and disposal of 750,000 cubic yards of soft organic silts from a 32 mile long manmade Canal that tranverses through Central New Jersey and is known as...

Sedimentation Study for the Rochester, Minnesota, Flood-Control Project
In a cooperative effort, the U. S. Army Engineer District, St. Paul (NCS), and the Soil Conservation Service (SCS) planned a combined flood-control project. The SCS portion of the project...

The Design and Construction of the Bartletts Ferry Labyrinth Weir Spillway
The discharge capacity of the Bartletts Ferry Project has been increased 165 percent by the addition of a labyrinth weir spillway. The hydraulic design was based on a published design...

Instruments Detect Dam Movement During Construction
Recent attention has been given to retrofitting electrical generation facilities at existing dams. Maintaining a safe structure during construction, and accomplishing this within a budget...

Fishways--Historical Assessment of Design Practice
Fishway design has evolved over the years in a conservative fashion. Research has led to the development of some innovative structures, but costs and water usage have been high. Conservative...

Alternative Layouts for Hydro Headrace Tunnels
The recent development of tunnel boring machines capable of excavating hard rock at virtually any grade together with the Norwegian experience in compressed air surge tanks provides the...

Hydropower Plant on an Irrigation Pipeline
A 940-kW hydroelectric plant was installed on a renovated irrigation pipeline at a Bishop, California ranch. On its way to the ranch, the falling water now generates an average of 4. 2...

Negotiating a FERC License for the Terror Lake Project
Recently, a long, intense negotiation was completed over the Terror Lake Hydropower project on Kodiak Island in Alaska. The bargaining over the Federal Energy Regulatory Commission (FERC)...

Camp Far West Hydroelectric Project--From Concept to Reality
The project has progressed through a series of predictable development stages including a detailed feasibility study, major project licensing, an environmental Initial Study and Negative...

Innovative and Affordable Residential Development
The rise in cost of land, housing construction and financing over recent decades has seriously reduced the number of those eligible for home loans. These and other cost factors are carefully...

Applications of Small Computers in Construction
These proceedings are from a technical session sponsored by the Task Committee on the Application of Small Computers in Construction of the Construction Division. Five papers are presented....

 

 

 

 

Return to search