Integrated Cost and Schedule Control Automation
Effective management of construction projects depends on good access to and control of data, especially data pertaining to cost and schedule control functions. Long recognizing the need...
Integration of Cost and Schedule Control
This paper presents cost control and schedule control relationships in an integrated manner for an activity/cost account that has a single output scheduled to be produced in a linear,...
Zero-based Contracts for Dispute Avoidance
There is presently considerable interest in reducing the costs associated with disputes and litigation in the facility acquisition process. One of the best ways to reduce such costs is...
Time/Cost Bidding
This paper presents the details of a relatively new and innovative approach to determining the low bidder on highway construction contracts. In the cost and time method each bidder proposes...
Designing Better Hollow Fibre Contactors
In this paper we calculate optimum hollow fibre module designs for gas absorption by maximizing the mass transferred per unit cost. Two costs are considered; the membrane cost and the...
Double-Decking the Freeways
Elevated highways cost more than at-grade construction. Nonetheless, the hidden costs of increased traffic congestion and the real cost of urban right-of-way make elevated highways feasible....
Regional Risk Assessment of Environmental Contamination from Oil Pipelines
This paper presents a methodology for assessing the risk of environmental contamination from oil pipeline leaks due to earthquakes. Risk is measured both as volume of oil released and...
Cost Savings from AVMC Systems in Trucking
The paper presents a brief overview of a methodology by which the cost savings of advanced vehicle monitoring and communication (AVMC) systems in long distance or intercity trucking can...
Magnetically levitated vehicle technology, maglev, serves as a potential solution to ever increasing transportation demands. Though interest in maglev appears to be increasing, an appropriate...
The Marina Environment from a Boaters Point of View
A discussion of the benefits and problems encountered by the recreational boater as a tenant of both the public and private marinas in Southern California is presented....
Economic Considerations of Marina Design
The planning and design of a marina involves decision making to optimize the economic return of the entire project. Decisions relating to land-use, water-use, and construction require...
Airport Construction: The Japanese Way
Japan is spending tens of billions of dollars on airport projects domestically and abroad through their aid programs. Examples of construction at the New Osaka Airport (Kansai), Narita/Tokyo,...
ASCE Salary Survey 1991
The 21st biennial ASCE salary survey of the engineering profession conducted by the ASCE Committee on Employment Conditions during the first half of 1991 is presented. It consists of an...
Minimum Lifetime Cost Design of Coastal Structures?A Proposal of Design Method for Rubble Sloping Breakwaters
The authors propose herein a rational design method for coastal structures with consideration for their repairs. The special characteristics of the proposal are that a certain extent of...
Structural Safety and Satisfaction
The mathematical program of a cost extremum constrained by safety, functional and other statements is a comfortable image of design. In this paper the various components of this program...
Modelling of Damage Due to Structural Failure
A multistage method of simulating failure situations associated with collapse of structures is described. Method is applied to evaluate statistical characteristics of the size and cost...
One Power Plant, Two Job Sites
In response to the lingering questions about energy, officials from Vidalia, La initiated a plan in 1977 to build a hydroelectric plant at a site 90 mi northwest of Baton Rouge, where...
Comprehensive Leak Detection Survey and Benefit/Cost Analysis
Fort Carson, Colorado was the site of a comprehensive leak detection investigation of the potable water system with the express purpose of quantifying the benefits to be derived by a military...
Optimal Design of Water Transmission Mains
Capital cost for constructing a water transmission main includes cost of the pipeline and its associated installation costs. Also included in the capital cost is the cost of a pump station....
A Look Back in Time to Verify Life Cycle Cost Analyses
The proper engineering design of any hydraulic structure requires consideration of different but interrelated fields of: 1) Planning, 2) Hydrology, 3) Hydraulics, 4) Structural, 5) Installation,...