Verification of WASURO Using the Puerto Nuevo Physical Model Study Results
The Jacksonville District, US Army Corps of Engineers, used the hydraulic design computer modeling program, WASURO, for preliminary design of the Rio Puerto Nuevo Flood Control System....

Detention Basin Design to Control Flood Volumes
A desk-top method is presented for hydraulic design of detention basins. The main objective is to control the flood volume rather than the peak discharge. The method is based on the pre-determined...

Hydraulic Roughness and Sediment Yield in Wheel Ruts on Forest Roads
Clear water flow and sediment yield from simulated wheel ruts in a forest road were measured at five different sites in the Northern Rocky Mountains. These measurements provided information...

Model Studies on Local Scour
In this investigation, the scaling procedure of a scour model in the laboratory has been indicated. The results have been compared with the prototype data....

Effect of Manning's Roughness Coefficient in Simulating Flow Parameters in Natural Channels
Manning's roughness coefficients are presented for three of the oldest and largest irrigation canals in Egypt. The discharges ranges from 35 to 318 m3/s....

Cofferdam Rip-Rap Protection for the New Esna Barrage
A 1:60 undistorted mobile bed model of the Nile River in the vicinity of Esna Barrage was constructed at the Hydraulics and Sediment Research Institute to test rip-rap protection of the...

Calibration of Beni-Mazar Movable Bed Model
A sand-bed model representing a reach of the Nile River was constructed to study alternative solutions to maintaining the navigation channel. Flume tests were carried out first to determine...

Fluvial Recharge of Sand Mining Pit
Accuracy in modeling fluvial processes becomes increasingly important as development occurs along waterways. The FLUVIAL-12 (1, 2) model is used to simulate the recharge of sand mining...

Temporary Facilities?Making It Happen, Organization and Logistics
As construction projects become larger, more complex and are constructed both faster and under more adverse conditions--the use of temporary facilities is more prevalent. Temporary facilities...

The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...

Legal Principles and Theories
Legal issues are intertwined with all aspects of the technical considerations relating to temporary structures. This paper presents an introduction to the legal theories which relate to...

Liability Insurance Coverages for Designers of Temporary Structures
A recent survey completed by the American Consulting Engineers Counsel (ACEC) indicates that in 1990 approximately 40 claims occurred per 100 firms. There also is an indication that claims...

Limit States Design of Wooden Formwork for Concrete Walls
Load and resistance factors are developed for ultimate limit states design of wooden formwork components for concrete walls when the lateral concrete pressures are computed using the ACI...

Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....

Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...

Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...

Temporary Lateral Support System for Historic Building Facades in Boston
This paper describes a system of vertically cantilevered structural steel trusses, designed by the author, that provided temporary lateral support for a group of five and six story, 120...

Performance of a Prestressed Rigid Frame During Removal of Column 6W from I93 in Boston, Massachusetts
The first phase of the suppression of Boston's Central Artery included the Early Viaduct Construction in the Central Artery North Area. This project required that Column 6W...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Modular-Prestressed Shoring System for Demolition
Two case histories are used to present the development and performance of a modular prestressed vertical shoring system to control deflections of existing structures during the demolition...

 

 

 

 

Return to search