Order Amid Uncertainty (Available in Geoenvironmental special issue only)
Bayesian statistical methods allow engineers to deduce probabilities from incomplete information. If there is a theoretical or empirical reason why a particular probability distribution...
Resolution Solutions
Disputes over such issues as change orders, extra work, delays, or defective work are an inescapable part of the construction process. By designing an effective dispute management program...
Power Struggle
The Florida Light and Power Company could have replaced its deteriorating, H-shaped wooden power poles in the Tomoka River with exact duplicates, but they chose to use hybrid steel-and-concrete...
Program Management B.C.
Through a process of forensic analysis that applied modern-day technology to bridge the chasm of time, a team of construction managers with the international architecture/engineering/construction...
Sensitivity of Stormwater Conveyance System Cost to Design Recurrence Interval
(No paper) The cost of a piped and/or swaled stormwater system is determined principally by the storm recurrence interval (e.g., 5-year design storm) used to design it. That is, the present...
Title Transfer of U.S. Bureau of Reclamation Projects: Fact or Fiction
(No paper) The U.S. Bureau of Reclamation (Reclamation) has constructed hundreds of water storage and delivery projects throughout the 17 western United States. These projects vary in...
Keeping a Low Profile
The Admiral Clarey Bridge in Pearl Harbor, Hawaii, combines fixed and floating bridge elements to span more than 4,500 ft (1,372 m) while hovering just above the harbor waters. The bridge,...
Catch the Wind
Wind turbines can now produce energy that is cost-competitive with other, more conventional power generation methods. The increased efficiency is due in part to the turbines'...
Under Pressure
The Arrowhead East and West contracts for the Inland Feeder water conveyance system being built in California consist of 51,500 ft (15,700 m) of tunnels that cross the San Andreas Fault...
Main Line Mending
Both the Washington Suburban Sanitary Commission (WSSC), of Laurel, Maryland, and the Providence Water Supply Board, of Rhode Island, are conducting massive, multimillion-dollar rehabilitation...
Geo-Engineering for Underground Facilities
The papers collected in this proceedings
The Train to the Plane
Getting to New York's John F. Kennedy Airport is an urban nightmare. The Port Authority (PA) of New York and New Jersey, which operates the airport, has wrestled with proposals...
Stream Stability and Scour at Highway Bridges
Compendium of Stream Stability and Scour Papers Presented at Conferences Sponsored by the Water Resources Engineering (Hydraulics) Division of the American Society of Civil Engineers
Sponsored by the Water Resources Engineering (Hydraulics) Division of ASCE. This collection contains 75 papers and 321 abstracts presented at conferences...
Towering Over Xiamen (Available in Structural Engineering Special Issue only)
Composite structural systems are rapidly becoming the preferred choice for high-rise buildings, due to their high strength and stiffness, large ductility, and convenient, economical construction....
Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...
Cold Regions Engineering
Putting Research into Practice
This proceedings,
Pipeline Safety, Reliability, and Rehabilitation
This proceedings,
Who Provides Inspection
With the increasing interest in the design-build project deliver system, the decision of who should be responsible for quality assurance/quality control has become a complex one. To assist...
Back from the Brink
The Cape Hatteras Lighthouse, the tallest brick lighthouse in the United States, has been moved to prevent it from toppling into the sea as a result of coastal erosion. Engineers from...
Managing the Megaproject
The Mon/Fayette Expressway and Southern Beltway will link Pittsburgh, Pennsylvania and Morgantown, West Virginia via a 104 km, $3.5 billion Y-shaped highway. With the project split into...
Return to search